In the matter of: Kerala State Electricity Regulatory Commission (Renewable Energy and Net Metering) (Second Amendment) Regulations, 2024.
Statement of reasonsDated 7 Aug 2024No. 230/Con.Engg/2023/KSERC dated 7 th August, 2024
Replaced by Renewable Energy and Related Matters Regulations, 2025
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the Renewable Energy and Net Metering Regulations, 2020 or one of its amendments.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken under the above Regulations shall be deemed to have been done or taken under the corresponding provisions of these Regulations.”
Summary
Summary written by software, from pages 1 to 30 of 74. Check the regulator's original before you rely on it.
KSERC's Statement of Reasons, dated 7 August 2024, explains and accompanies the final KSERC (Renewable Energy and Net Metering) (Second Amendment) Regulations, 2024 (p1). It is not a standalone tariff order: it records the statutory background, the draft amendments published on 29 January 2024, two public hearings held on 20 March and 15 May 2024, stakeholder comments, and the Commission's final decisions (p1, p5).
The background paragraphs set out the Commission's section 86(1)(e) mandate, the 2020 RE and Net Metering Regulations, the 2022 first amendment, MoP's RPO/ESO trajectory, ISTS charge waivers, URET, and Kerala's State Climate Change Action Plan 2.0 target of higher RE reliance (pp1–5). They also explain two non-definitional changes: extending the Chapter IV control/review period to FY 2024-25 and raising the distribution transformer loading limit for RE connectivity from 75% to 90% (pp4–5).
The main body amends definitions in Regulation 2: ESS, ESO, net billing/net feed-in, Other RPO, HPO, PSP, Renewable Energy System, Renewable Source of Energy and WPO, with stakeholder objections and Commission rulings on each (pp6–17). Regulation 3 inserts Table 1(a), the RPO and ESO trajectory for FY 2024-25 to 2029-30; the Commission lowered the initial draft RPO/ESO after KSEB Ltd and other stakeholders objected, while retaining an accelerated State trajectory (pp17–26). Regulations 4, 5 and 6 adjust compliance and accounting flexibility for distribution licensees, captive consumers and consumers, including carry-over among HPO, WPO and Other RPO (pp26–27). Regulation 8 is restructured for REC purchase and annual RPO reporting (pp27–28), and Regulation 10 carries a transition proviso saying which regulation governs RPO for each financial year from up to 2021-22 through 2029-30 (p28). Regulation 13(2)(a) gets an explanation that inverter AC output in kW is 90% of total solar panel kWp, triggering stakeholder debate on DC oversizing and AC:DC ratios (pp28–30).
Read with this
The regulation
- Dated 7 Feb 2020Renewable Energy and Net Metering Regulations, 2020
Amendments and corrections
Commencement notices and reasons
Other copies of these documents (2)
3 more documents belong here and are not on Voltaic: 3 copies in another language.
Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.