Summary
Summary written by software, from pages 1 to 32 of 36. Check the regulator's original before you rely on it.
This is the Central Electricity Regulatory Commission's approach paper for the tariff control period 1.4.2014 to 31.3.2019, issued to solicit stakeholder views before the next Terms and Conditions of Tariff Regulations are framed (p1, p3, p5). It is a consultation document, not a regulation: each chapter restates existing practice, flags perceived weaknesses and closes with numbered questions on which comments are invited (p5, p6–10, p11, p18–19).
Chapter 3 (pp6–23) works through the financial norms under the existing 'hybrid' approach: capital cost — projected versus actual cost at COD, interest during construction, benchmark capital cost, mandatory competitive bidding, trial-operation methodology, telemetry and RGMO prerequisites, PAT-scheme expenditure, compensation allowance and truing up (pp6–10); renovation and modernisation and the special allowance (pp10–11); depreciation and re-assessment of useful life (pp11–12); the gross versus net fixed asset base (p13); debt:equity (pp13–14); the choice between return on equity and return on capital employed with WACC (pp14–16); the level and basis of ROE including grossing-up, 80-IA benefits and possible CAPM linkage (pp16–19); cost of debt and benchmarking (pp19–20); interest on working capital (pp20–22); and O&M norms, including an RPI-X style escalation and normative O&M for hydro (pp22–23).
Chapter 4 (pp24–26) sets out an alternative tariff design — annual fixed cost fixed in the first year at COD, split into an escalable slice and a degression curve, with energy charges passed through — so that later regulatory changes would not apply to a project once its trajectory is fixed.
Chapter 5 (pp26–32) covers operational norms: station heat rate, secondary fuel oil consumption, auxiliary energy consumption, normative annual plant availability, transit and handling losses and norms for coal-reject plants for thermal generation (pp27–30); hydro NAPAF (pp30–31); transmission availability computation and outage weightage factors (p31); and the incentive mechanism, including differential peak/off-peak incentives and incentives for storage and pondage hydro (pp31–32).
Chapter 6 (p32) begins on fuel availability, describing the risk of stranded capacity from coal and gas shortages; the contents list shows a further section on tariff application methodology that falls in the pages not supplied (p2).
Read with this
The regulation
- Dated 26 Aug 2015Generation Tariff Regulations, 2014
Commencement notices and reasons
Procedures and orders made under it
Other copies of these documents (1)
- Dated 26 Aug 2015Generation Tariff Regulations, 2014 — Order
One more document belongs here and is not on Voltaic: a commencement notice or statement of reasons not held as English text.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.