KERC · Karnataka Electricity Regulatory Commission
Generation Tariff Regulations, 2014 — Stakeholder Comments and Commission's Analysis (Appendix VI)
Comments/Suggestions received from the stakeholders on the draft Regulations and the Commission's analysis
ReportDate not stated
Replaced by Generation Tariff Regulations, 2019
See that regulation for the date it took effect and for anything it keeps in force.
Read with the Generation Tariff Regulations, 2014.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is Appendix VI to KERC's generation tariff rule-making record (p1). It summarises comments received on the draft KERC (Terms and Conditions for Determination of Generation Tariff) Regulations, 2014, following a public hearing on 29 April 2015, and sets out the Commission's analysis and decisions on each point (p1).
Sections a to h cover the main contested issues. KPCL challenged thermal operational norms under Regulation 26(c), particularly Gross Station Heat Rate; the Commission accepts an approach based on OEM design heat rate and historical performance data, fixes heat rates for BTPS Unit-2 and RTPS Unit-8, and notes gain-sharing under Regulation 8.1.7 and truing up (p1–2). On depreciation under Regulation 18, KPCL sought actual loan repayment basis; the Commission rejects this, explaining normative repayment and debt-equity treatment (p2–3). On interest on working capital under Regulation 19, the Commission rejects using actual coal cost or escalation and explains the normative working capital components (p3). On scheduling, accounting and billing under Regulation 35, KPCL sought late payment surcharge after 30 days instead of 60 days; the Commission rejects this because ESCOMs need time to recover costs, and leaves outstanding dues to PPA terms (p4). On IEDC under Regulation 8.2.2, KPCL sought capitalisation of time overrun; the Commission rejects this to avoid burdening consumers (p4). On affidavits for new stations under Regulation 5.1(1)(a) and (b), KPCL sought one year from COD instead of six months before COD; the Commission rejects this, citing additional capitalisation under Regulation 10 (p4–5). BESCOM's requests on rebate under Regulation 31 and on mandatory annual true-up under Regulation 7 are also rejected or answered, with the Commission noting existing true-up provisions and KPCL's petitions (p5). The appendix records reasoning; operative norms are left to the final regulations.
Read with this
The regulation
- Dated 26 Aug 2015Generation Tariff Regulations, 2014
Commencement notices and reasons
Procedures and orders made under it
Other copies of these documents (1)
- Dated 26 Aug 2015Generation Tariff Regulations, 2014 — Order
One more document belongs here and is not on Voltaic: a commencement notice or statement of reasons not held as English text.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.