KERC · Karnataka Electricity Regulatory Commission
Thermal Tariff Filing Forms, Appendix V Part I
TARIFF FILING FORMS (THERMAL) FOR DETERMINATION OF TARIFF APPENDIX-V PART-I
OrderDate not stated
Replaced by Generation Tariff Regulations, 2019
See that regulation for the date it took effect and for anything it keeps in force.
Made under the Generation Tariff Regulations, 2014.
Summary
Summary written by software. Check the regulator's original before you rely on it.
Part-I of Appendix-V is a filing-forms package for thermal generating stations seeking tariff determination. The opening pages (pp2–4) are a checklist of forms and supporting documents, covering audited accounts, loan and equity agreements, PPA/BPSA copies, DPR, CPM/PERT charts and overrun justifications. Form-1 is the Summary Sheet (p5), with Form-1(I) claimed capital cost and Form-1(II) return on equity (p6). Form-2 captures plant characteristics (pp7–8); Form-3 sets out the normative parameters to be filled in for tariff computations (p9). Forms 4 and 4A collect foreign loan and foreign equity details (pp10–12).
Capital-cost forms begin with an abstract of admitted capital cost for existing projects (p13) and a new-project estimate/commissioning abstract (p14), followed by detailed break-ups for coal/lignite (pp16–22) and gas/liquid fuel (pp23–27) projects, package-wise construction/supply/service costs (p28), and new-project variables and optional packages (p29). Overrun and extra-return forms follow: cost overrun (pp30–35), time overrun (p36) and additional RoE claims (p37). Financial-package and loan forms cover project-specific and corporate-loan allocation (pp38–43).
Additional capitalisation after COD, its fag-end variant, de-capitalisation, reconciliation and exclusion statements occupy pp44–53; financing of additional capitalisation is Form-10 (p54). Asset-related formats follow: depreciation calculation and statement (pp55–56), weighted average interest on actual loans (pp57–58), normative-loan interest (p59) and working-capital interest (p60). The remaining forms cover other income (p61), incidental expenditure during construction (p62), package expenditure (p63), drawdown and IDC/financing charges (pp64–67), actual cash expenditure (p68), fuel details for energy charges (pp69–71), limestone (p72), capital spares (p73) and the liability flow statement (p74). The text does not print the issuing Commission or a notification date; it refers to CERC's depreciation schedule and Regulations 25 and 30(6), and to CEA Technical Standards 2010.
Read with this
The regulation
- Dated 26 Aug 2015Generation Tariff Regulations, 2014
Commencement notices and reasons
Procedures and orders made under it
Other copies of these documents (1)
- Dated 26 Aug 2015Generation Tariff Regulations, 2014 — Order
One more document belongs here and is not on Voltaic: a commencement notice or statement of reasons not held as English text.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.