Skip to content

KERC · Karnataka Electricity Regulatory Commission

Tariff Filing Forms (Hydro), Appendix V Part-II — Generation Tariff Regulations, 2014

TARIFF FILING FORMS (HYDRO) FOR DETERMINATION OF TARIFF APPENDIX-V PART-II

OrderDate not stated

Replaced by Generation Tariff Regulations, 2019

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Generation Tariff Regulations, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

Part-II of the hydro tariff filing forms is a filing kit, not a tariff order: it tells a hydro generating company what to submit, in what format, when seeking tariff determination. Pages 2–4 are a checklist of forms and supporting documents, with tick columns; they require audited station/corporate accounts, loan agreements, BPSA/PPA copies, DPR, CPM/PERT charts, cost-overrun justifications and cost audit reports (pp2–4).

The forms then walk through the petition. The Summary Sheet and Form-1(I)/(II) capture claimed capital cost and return on equity, with calculation notes (pp5–6). Form-2 lists COD, station type, free power, design energy, auxiliary consumption and NAPAF (pp7–8). Form-3 gives salient project features (pp9–10). Forms 4 and 4A schedule foreign loans and foreign equity (pp11–14).

The capital-cost block is the largest: Form-5 abstracts CERC-admitted cost for existing projects (p15); Form-5A covers new-project estimates (pp16–17); Forms 5B, 5C and 5D break cost down by station head, plant and equipment, and construction/supply/service package (pp18–25); Forms 5Ei, 5Eii and 5F deal with cost overrun, time overrun and additional RoE claims (pp26–33).

Financing and true-up forms follow: Form-6 financial package up to COD (p34); Forms 7 and 8 project-specific and corporate-loan allocation (pp35–38); Forms 9A–9F additional capitalisation, de-capitalisation, exclusions, capital cost and CWIP statements (pp39–48); Form-10 financing of additional capitalisation (p49). Depreciation, weighted-average interest, normative-loan interest and working-capital interest are covered by Forms 11–13A and the working-capital form (pp50–55). Other income and IEDC forms sit at pp56–57.

Operational data comes through Form-14/14A (IDC and financing-charge drawdown; actual cash expenditure, pp58–62) and Forms 15A/15B (month-wise design energy and peaking or continuous MW for ROR and pondage/storage stations, pp63–66). Form-16 is a liability flow statement (p67). The visible text states no issue or gazette date; it repeatedly ties the forms to the 2014-19 tariff period and reference dates of 31.03.2014 or COD (pp35, 39, 50).

Standard name
Generation Tariff Regulations
Primary topics
Generation tariff, Capital cost and investment, Return, financing and working capital

Read with this

The regulation

Procedures and orders made under it

Other copies of these documents (1)

One more document belongs here and is not on Voltaic: a commencement notice or statement of reasons not held as English text.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document