Tariff Filing Forms (Hydro), Appendix V Part-II — Generation Tariff Regulations, 2014
TARIFF FILING FORMS (HYDRO) FOR DETERMINATION OF TARIFF APPENDIX-V PART-II
OrderDate not stated
Replaced by Generation Tariff Regulations, 2019
See that regulation for the date it took effect and for anything it keeps in force.
Made under the Generation Tariff Regulations, 2014.
Summary
Summary written by software. Check the regulator's original before you rely on it.
Part-II of the hydro tariff filing forms is a filing kit, not a tariff order: it tells a hydro generating company what to submit, in what format, when seeking tariff determination. Pages 2–4 are a checklist of forms and supporting documents, with tick columns; they require audited station/corporate accounts, loan agreements, BPSA/PPA copies, DPR, CPM/PERT charts, cost-overrun justifications and cost audit reports (pp2–4).
The forms then walk through the petition. The Summary Sheet and Form-1(I)/(II) capture claimed capital cost and return on equity, with calculation notes (pp5–6). Form-2 lists COD, station type, free power, design energy, auxiliary consumption and NAPAF (pp7–8). Form-3 gives salient project features (pp9–10). Forms 4 and 4A schedule foreign loans and foreign equity (pp11–14).
The capital-cost block is the largest: Form-5 abstracts CERC-admitted cost for existing projects (p15); Form-5A covers new-project estimates (pp16–17); Forms 5B, 5C and 5D break cost down by station head, plant and equipment, and construction/supply/service package (pp18–25); Forms 5Ei, 5Eii and 5F deal with cost overrun, time overrun and additional RoE claims (pp26–33).
Financing and true-up forms follow: Form-6 financial package up to COD (p34); Forms 7 and 8 project-specific and corporate-loan allocation (pp35–38); Forms 9A–9F additional capitalisation, de-capitalisation, exclusions, capital cost and CWIP statements (pp39–48); Form-10 financing of additional capitalisation (p49). Depreciation, weighted-average interest, normative-loan interest and working-capital interest are covered by Forms 11–13A and the working-capital form (pp50–55). Other income and IEDC forms sit at pp56–57.
Operational data comes through Form-14/14A (IDC and financing-charge drawdown; actual cash expenditure, pp58–62) and Forms 15A/15B (month-wise design energy and peaking or continuous MW for ROR and pondage/storage stations, pp63–66). Form-16 is a liability flow statement (p67). The visible text states no issue or gazette date; it repeatedly ties the forms to the 2014-19 tariff period and reference dates of 31.03.2014 or COD (pp35, 39, 50).
Read with this
The regulation
- Dated 26 Aug 2015Generation Tariff Regulations, 2014
Commencement notices and reasons
Procedures and orders made under it
- Date not statedThermal Tariff Filing Forms, Appendix V Part I
Other copies of these documents (1)
- Dated 26 Aug 2015Generation Tariff Regulations, 2014 — Order
One more document belongs here and is not on Voltaic: a commencement notice or statement of reasons not held as English text.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.