KERC · Karnataka Electricity Regulatory Commission
Generation Tariff Regulations, 2014 — Order
Karnataka Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff) Regulations, 2014
Regulation · CopyDated 26 Aug 2015F-34/Vol-12 dated 26.08.2015
Replaced by Generation Tariff Regulations, 2019
See that regulation for the date it took effect and for anything it keeps in force.
The copy of the Generation Tariff Regulations, 2014.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Karnataka Electricity Regulatory Commission's order dated 26 August 2015 approving the KERC (Terms and Conditions for Determination of Generation Tariff) Regulations, 2014, which are annexed as Appendix-I (p3). The body of the text is the preamble and the operative order; the regulations themselves are not reproduced here.
The preamble (pp1-3) sets out why the Commission is acting: section 61 of the Electricity Act 2003 requires it to specify the terms and conditions for determining generation tariff in the State on the principles and methodology laid down by the Central Commission, and section 181(2)(zd) gives it the power to make regulations for that purpose. It lists the section 61 guidelines it says it follows - commercial principles, competition and efficiency, consumer interest alongside reasonable cost recovery, multi-year tariff principles, progressive cost-reflectiveness and reduced cross-subsidies, and promotion of co-generation and renewable generation (p1).
The order records the process: the previous generation tariff regulations for the 2009-14 control period were issued under notification No. S/03/O dated 9 September 2009; that control period ended on 31 March 2014; CERC issued its own Generation Tariff Regulations 2014 on 21 February 2014; KERC began work in June 2013 by calling details from Karnataka Power Corporation Ltd, published draft regulations for the tariff period 01.04.2014 to 31.03.2019, took comments from stakeholders including KPCL and BESCOM and held a public hearing on 29 April 2015 (p2-3). Having considered those views, the Commission approves the regulations as in Appendix-I, with the stakeholder comments annexed at Appendix VI (p3).
Read with this
The regulation
- Dated 26 Aug 2015Generation Tariff Regulations, 2014
Commencement notices and reasons
Procedures and orders made under it
One more document belongs here and is not on Voltaic: a commencement notice or statement of reasons not held as English text.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.