Distribution Open Access Regulations, 2016

Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016

Regulation · Gazette copyDated 30 Mar 2016No./MERC/Tech/Open Access Distribution/Regulations/2016/01742

The Gazette copy of the Distribution Open Access Regulations, 2016.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software, from pages 1 to 142 of 199. Check the regulator's original before you rely on it.

These are MERC's 2016 regulations for open access to, and connectivity with, the distribution systems of distribution licensees in Maharashtra, issued as notification No. MERC/Tech/Open Access Distribution/Regulations/2016/01742 (p100). They cover use of a licensee's distribution network, and also cases where the network is not used but an open access consumer is supplied within the licensee's area (Reg 1.2, p100). They take effect on publication in the Official Gazette.

Part A (pp100–109) sets the framework: 39 definitions that fix the working vocabulary used throughout (pp100–106); who may apply and the consumer eligibility threshold; processing of applications, application formats, revision of contract demand, completion of network works within Standards-of-Performance timelines, final meter reading at commencement of open access, settlement of dues before applying (with a route to proceed against a deposit where a charge is disputed), and space for licensee equipment.

Part B (pp109–113) governs connectivity: who may connect to the distribution system and on what technical-feasibility basis, the interconnection study done with the STU, application fees differentiated for renewable generators, who bears the cost of creating or augmenting facilities (with a renewable carve-out), the Connection Agreement in the Annexure II format, and injection of infirm power during pre-commissioning testing, including the time limit for testing and the commercial treatment of such power. Connectivity alone does not confer open access (Reg 5.9, p111).

Part C (pp113–129) is the operational core: the Open Access Agreement and its Annexure V format, notice and signing timelines; the three duration categories (LTOA, MTOA, STOA) with the rule for the three-to-twelve-year gap; the nodal agency (normally the distribution licensee) and the nodal-officer single point of contact; a table of nodal agency and accompanying documents by injection/drawal location and duration; the separate route for inter-state open access under CERC regulations; and the detailed procedures and decision timelines for long-term, medium-term and short-term open access. Short-term open access includes advance monthly applications, congestion bidding with its own formats, day-ahead open access, surrender and non-utilisation rules, and the distribution licensee's consent role alongside MSLDC; Regulation 13 fixes allotment priority and pro-rata allocation.

Part D (pp129–135) prescribes what the open access bill contains (wheeling charges, cross-subsidy surcharge, additional surcharge, MSLDC fees and charges, transmission charges and other sums), who is billed in each situation, payment and remittance timelines, the basis for wheeling charges, the levy and exemptions for cross-subsidy surcharge, the conditions under which additional surcharge may be charged and who is exempt, additional security for wheeling, and the consequence of breaching the State Grid Code.

Part E (pp135–138) covers scheduling (by MSLDC under the State Grid Code, or under the Indian Electricity Grid Code for inter-state transactions; non-firm renewable plants exempt), metering and communication (Special Energy Meters, procurement and testing timelines, monthly reading, RTU-DC installation and real-time communication), and who bears transmission and distribution losses, explicitly excluding commercial losses.

Part F (pp138–142) deals with imbalance charges: settlement of over- and under-drawal by consumers, over- and under-injection by generators, state-pool participation and a gaming-investigation threshold, the State Imbalance Pool account operated by MSLDC, payment and refund windows, and penal interest on delay. The Part is titled "Imbalance and Reactive Energy Charges"; anything on reactive energy charges lies beyond page 142.

Standard name
Open Access Regulations
Primary topics
Open access, Connectivity and GNA, Open access charges

Read with this

The regulation

8 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft, 2 drafts or notices on a draft not held as English text and 1 copy in another language.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document