Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Distribution Open Access Regulations, 2016 — Second Amendment, 2023

Maharashtra Electricity Regulatory Commission (Distribution Open Access) (Second Amendment) Regulations, 2023

AmendmentDated 10 Nov 2023No. MERC/Tech/Regulation/0595 dated 10th November 2023

Amends the Distribution Open Access Regulations, 2016.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the MERC (Distribution Open Access) (Second Amendment) Regulations, 2023, issued by the Maharashtra Electricity Regulatory Commission on 10 November 2023, amending the 2016 Distribution Open Access Regulations as amended in 2019 (p6, p9). It operationalises Green Energy Open Access in Maharashtra, following the Electricity (Promoting Renewable Energy Through Green Energy Open Access) Rules, 2022 and subsequent Ministry of Power amendments (p6). Earlier pages are not included.

The amendment inserts definitions for Central Nodal Agency, Entity, Forum of Regulators, Green Ammonia, Green Hydrogen, Renewable Energy / Green energy, and Rules (p6–7). It deletes two provisos to Regulation 3.2 and inserts Regulations 3.3 and 3.4: consumers with contract demand or sanctioned load of 100 kW or more, or multiple connections aggregating 100 kW or more in the same electricity circle, are eligible for Green Energy Open Access; captive consumers have no load limit; MSEDCL has a licence-area restriction while other distribution licensees use the entire licence area; consumers must not change open access quantum for at least twelve time blocks; and green attributes must not be sold separately as RECs (p7–8). Rooftop renewable consumers may simultaneously avail open access, with net drawal adjusted for banking credit (p8).

The amendment requires Central Nodal Agency procedures and formats for applications, assigns short-term nodal agency duties to SLDC and medium/long-term duties to STU, and requires distribution licensees to provide necessary details (p8). It exempts cross-subsidy and additional surcharge for non-fossil waste-to-energy, green hydrogen/ammonia, offshore wind commissioned up to December 2032, and green energy open access consumers paying fixed charges (p8–9). It permits Green Energy Open Access below 1 MW using special energy meters or ToD meters (p9). It substitutes banking charge and lapsed banked energy provisions, with REC entitlement for lapsed banked energy (p9). Commencement is from Official Gazette publication; the Gazette date is not printed (p6, p9).

Standard name
Open Access Regulations, Green Energy Open Access Regulations
Primary topics
Green energy open access, Open access, Open access charges

Read with this

The regulation

Amendments and corrections

Other copies of these documents (1)

8 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft, 2 drafts or notices on a draft not held as English text and 1 copy in another language.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document