Distribution Open Access Regulations, 2016

Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016

RegulationDated 30 Mar 2016No./MERC/Tech/Open Access Distribution/Regulations/........

2 amendments to it are on Voltaic, the latest dated 10 Nov 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software, from pages 1 to 46 of 103. Check the regulator's original before you rely on it.

These are the Maharashtra Electricity Regulatory Commission's principal regulations for open access to distribution systems in Maharashtra, made under the Electricity Act, 2003 (p4). The index maps 38 regulations in nine parts and five annexures (pp1-3). Part A (pp4-13) covers title, extent and commencement, definitions, eligibility and application processing for connectivity and open access. A consumer needs Contract Demand of 1 MW and above to be eligible; ongoing eligibility requires Maximum Demand of at least seventy (70) percent of that threshold, with penalty and possible reassessment for three consecutive shortfalls (pp10-11). Distribution Franchisee consumers may apply, but a franchisee cannot except as a consumer (p11). Part B (pp13-17) specifies grant of connectivity for generating stations, application fees, inter-connection study with STU, cost responsibility, Connection Agreement, and treatment of infirm power before commercial operation. Part C (pp17-33) covers the Open Access Agreement, duration categories (LTOA, MTOA, STOA), the Nodal Agency and application procedure, separate LTOA/MTOA/STOA processes including bidding where STOA congestion is anticipated, consent by the Distribution Licensee, and allotment priority. Part D (pp33-39) sets out billing heads and principles for wheeling charges, cross-subsidy surcharge, additional surcharge, additional security, and State Grid Code compliance. Part E (pp39-42) addresses scheduling by MSLDC or the Distribution Licensee, Special Energy Meters and RTU-DC, and allocation of transmission and distribution losses. Part F begins imbalance charges for over/under-drawal and over/under-injection, including State Imbalance Pool settlement; the index shows banking of renewable generation and reactive energy charges continue at pp47-48.

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges, Connectivity and GNA

Read with this

Other copies of these documents (1)

8 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft, 2 drafts or notices on a draft not held as English text and 1 copy in another language.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.