MERC · Maharashtra Electricity Regulatory Commission
Distribution Open Access Regulations, 2016
Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016
RegulationDated 30 Mar 2016No./MERC/Tech/Open Access Distribution/Regulations/........
2 amendments to it are on Voltaic, the latest dated 10 Nov 2023.
Summary
Summary written by software, from pages 1 to 46 of 103. Check the regulator's original before you rely on it.
These are the Maharashtra Electricity Regulatory Commission's principal regulations for open access to distribution systems in Maharashtra, made under the Electricity Act, 2003 (p4). The index maps 38 regulations in nine parts and five annexures (pp1-3). Part A (pp4-13) covers title, extent and commencement, definitions, eligibility and application processing for connectivity and open access. A consumer needs Contract Demand of 1 MW and above to be eligible; ongoing eligibility requires Maximum Demand of at least seventy (70) percent of that threshold, with penalty and possible reassessment for three consecutive shortfalls (pp10-11). Distribution Franchisee consumers may apply, but a franchisee cannot except as a consumer (p11). Part B (pp13-17) specifies grant of connectivity for generating stations, application fees, inter-connection study with STU, cost responsibility, Connection Agreement, and treatment of infirm power before commercial operation. Part C (pp17-33) covers the Open Access Agreement, duration categories (LTOA, MTOA, STOA), the Nodal Agency and application procedure, separate LTOA/MTOA/STOA processes including bidding where STOA congestion is anticipated, consent by the Distribution Licensee, and allotment priority. Part D (pp33-39) sets out billing heads and principles for wheeling charges, cross-subsidy surcharge, additional surcharge, additional security, and State Grid Code compliance. Part E (pp39-42) addresses scheduling by MSLDC or the Distribution Licensee, Special Energy Meters and RTU-DC, and allocation of transmission and distribution losses. Part F begins imbalance charges for over/under-drawal and over/under-injection, including State Imbalance Pool settlement; the index shows banking of renewable generation and reactive energy charges continue at pp47-48.
Read with this
Amendments and corrections
Commencement notices and reasons
- Dated 30 Mar 2016Distribution and Transmission Open Access Regulations, 2016 — Statement of Reasons
- Dated 3 Jun 2019Distribution and Transmission Open Access Regulations, 2016 — First Amendment, 2019 — Statement of Reasons
- Dated 10 Nov 2023Distribution Open Access (Second Amendment) Regulations, 2023 — Statement of Reasons
Other copies of these documents (1)
- Dated 30 Mar 2016Distribution Open Access Regulations, 2016
8 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft, 2 drafts or notices on a draft not held as English text and 1 copy in another language.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.