Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Distribution Open Access Regulations, 2016 — First Amendment, 2019

Maharashtra Electricity Regulatory Commission (Distribution Open Access) (First Amendment) Regulations, 2019

AmendmentDated 7 Jun 2019MERC / Tech /2019/ 097 dated 7th June 2019

Amends the Distribution Open Access Regulations, 2016.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the first amendment to the Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 ('the Principal Regulations'), issued on 7 June 2019 and coming into force from the date of publication in the Official Gazette. It rewrites the eligibility and charging architecture for open access on the distribution system and links the 2016 framework to the Commission's new deviation settlement regime.

Regulations 2–4 reset definitions and eligibility (p15–17): banking is re-defined around surplus renewable energy credited in the same Time of Day slot; contract demand, gross metering, LTOA, MTOA and Time Block are re-defined; eligibility is restated for consumers with contract demand of 1 MVA and above, with provisos on partial and full open access capacity, sourcing from renewable generators, consumers in distribution franchisee areas, a continuing minimum maximum-demand obligation with penalty and re-assessment consequences, and simultaneous rooftop solar on gross metering.

Regulation 4 governs revision of contract demand and introduces a Notional Contract Demand with incremental demand charges (p16–17). Regulation 5 routes infirm power testing and injection to the Deviation Settlement Mechanism Regulations, 2019 and, before their effective date, to the MYT Regulations (p17). Regulation 6 restates open access categories by duration (p17); Regulation 7 requires nodal agencies to process STOA/MTOA applications online within three months (p18); Regulation 11 sets minimum day-ahead open access duration and schedule-uniformity conditions (p18).

Charges are the centre of gravity. Regulation 9 amends transmission charges, imposing escalating multiplication factors on repeated STOA transactions in a financial year, directs wheeling charges, and inserts applicability matrices for wheeling charges and wheeling losses across voltage levels and licensees, plus a priority order for adjusting energy credit and the treatment of PF incentive/penalty (p18–22). Regulations 10–14 cover non-firm RE scheduling, Special Energy Meters for multi-unit generating stations within six months, intra-state transmission loss settlement, over-drawal/under-drawal and over-injection/under-injection settlement, and revised monthly banking with a cap on deemed purchase that counts toward the distribution licensee's RPO (p22–25). Regulation 15 reconstitutes the Open Access Monitoring and Review Committee; Regulation 16 provides transitional treatment for existing agreements and pending applications; Regulation 17 adds a power to relax (p25–26).

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges, Energy banking

Read with this

The regulation

Amendments and corrections

Other copies of these documents (1)

8 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft, 2 drafts or notices on a draft not held as English text and 1 copy in another language.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document