MERC · Maharashtra Electricity Regulatory Commission
Distribution and Transmission Open Access Regulations, 2016 — Statement of Reasons
Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 & Maharashtra Electricity Regulatory Commission (Transmission Open Access) Regulations, 2016 – Statement of Reasons
Statement of reasonsDated 30 Mar 2016
The commission's reasons for the Transmission Open Access Regulations, 2016 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Statement of Reasons issued by the Maharashtra Electricity Regulatory Commission (MERC) on 30 March 2016 alongside its 2016 Distribution Open Access (DOA) and Transmission Open Access (TOA) Regulations (p1). It explains why the Commission departed from the 2014 regulations and the 2015 drafts, records public consultation, and quotes the final regulation clauses it adopted. The introduction recounts the 2004/2005/2014 open-access regulations and the September–October 2015 public notices on the drafts, which drew 91 responses (p1–2).
The first issue concerns eligibility. The Commission rejected the proposal to lower the Contract Demand threshold to 500 kW and retained the 1 MW threshold, while allowing consumers to buy from multiple sources (p2–5). The banking chapter is the longest. It compares banking practices and charges in other states, analyses Maharashtra's monthly demand, and decides to reintroduce banking for renewable energy generators with restrictions on drawal months, TOD-slot matching, banking charges, and treatment of unutilised banked energy, including REC/RPO consequences (p5–11).
The next chapter deals with revision or reduction of Contract Demand. It gives LTOA and MTOA consumers the freedom to choose their Contract Demand under the Supply Code and Standards of Performance regulations, and restricts STOA consumers to revising it only when applying for Open Access (p12–14). The metering and scheduling chapter then sets out requirements for Special Energy Meters, automated meter reading, Remote Terminal Units, meter testing and installation timelines, data communication, and MSLDC scheduling responsibilities (p14–18).
Day-ahead Open Access is reintroduced, with a cut-off for normal applications and a separate, higher-fee route for contingency applications (p18–20). A short chapter on the TOA Regulations lists comments on eligibility, connectivity, nodal agency, and application procedure, and says relevant DOA changes were mirrored in TOA (p20–21). The final chapter notes that definitions and other clauses were revised for clarity (p21).
Read with this
Read with this: Transmission Open Access Regulations, 2016
The regulation
- Dated 30 Mar 2016Transmission Open Access Regulations, 2016
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
Other copies of these documents (1)
- Dated 30 Mar 2016Transmission Open Access Regulations, 2016
Earlier drafts
- Released with the notice dated 24 Sep 2015Transmission Open Access Regulations, 2015
- Dated 24 Sep 2015Public notice: Transmission Open Access Regulations, 2015 — Public Notice inviting comments on draft
2 more documents belong here and are not on Voltaic: 1 copy in another language and 1 draft or notice on a draft not held as English text.
It is also read with: Distribution Open Access Regulations, 2016
The commission's reasons for the Distribution Open Access Regulations, 2016 or one of its amendments.
The regulation
- Dated 30 Mar 2016Distribution Open Access Regulations, 2016
Amendments and corrections
Commencement notices and reasons
Other copies of these documents (1)
- Dated 30 Mar 2016Distribution Open Access Regulations, 2016
8 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft, 2 drafts or notices on a draft not held as English text and 1 copy in another language.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.