Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Distribution and Transmission Open Access Regulations, 2016 — Statement of Reasons

Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2016 & Maharashtra Electricity Regulatory Commission (Transmission Open Access) Regulations, 2016 – Statement of Reasons

Statement of reasonsDated 30 Mar 2016

The commission's reasons for the Transmission Open Access Regulations, 2016 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Statement of Reasons issued by the Maharashtra Electricity Regulatory Commission (MERC) on 30 March 2016 alongside its 2016 Distribution Open Access (DOA) and Transmission Open Access (TOA) Regulations (p1). It explains why the Commission departed from the 2014 regulations and the 2015 drafts, records public consultation, and quotes the final regulation clauses it adopted. The introduction recounts the 2004/2005/2014 open-access regulations and the September–October 2015 public notices on the drafts, which drew 91 responses (p1–2).

The first issue concerns eligibility. The Commission rejected the proposal to lower the Contract Demand threshold to 500 kW and retained the 1 MW threshold, while allowing consumers to buy from multiple sources (p2–5). The banking chapter is the longest. It compares banking practices and charges in other states, analyses Maharashtra's monthly demand, and decides to reintroduce banking for renewable energy generators with restrictions on drawal months, TOD-slot matching, banking charges, and treatment of unutilised banked energy, including REC/RPO consequences (p5–11).

The next chapter deals with revision or reduction of Contract Demand. It gives LTOA and MTOA consumers the freedom to choose their Contract Demand under the Supply Code and Standards of Performance regulations, and restricts STOA consumers to revising it only when applying for Open Access (p12–14). The metering and scheduling chapter then sets out requirements for Special Energy Meters, automated meter reading, Remote Terminal Units, meter testing and installation timelines, data communication, and MSLDC scheduling responsibilities (p14–18).

Day-ahead Open Access is reintroduced, with a cut-off for normal applications and a separate, higher-fee route for contingency applications (p18–20). A short chapter on the TOA Regulations lists comments on eligibility, connectivity, nodal agency, and application procedure, and says relevant DOA changes were mirrored in TOA (p20–21). The final chapter notes that definitions and other clauses were revised for clarity (p21).

Standard name
Open Access Regulations
Primary topics
Open access, Energy banking, Metering

Read with this

Read with this: Transmission Open Access Regulations, 2016

The regulation

Amendments and corrections

Other copies of these documents (1)

Earlier drafts

2 more documents belong here and are not on Voltaic: 1 copy in another language and 1 draft or notice on a draft not held as English text.

It is also read with: Distribution Open Access Regulations, 2016

The commission's reasons for the Distribution Open Access Regulations, 2016 or one of its amendments.

The regulation

Other copies of these documents (1)

8 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft, 2 drafts or notices on a draft not held as English text and 1 copy in another language.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document