MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (DISTRIBUTION OPEN ACCESS) (SECOND AMENDMENT) REGULATIONS, 2023. STATEMENT OF REASONS
Statement of reasonsDated 10 Nov 2023
The commission's reasons for the Distribution Open Access Regulations, 2016 or one of its amendments.
Summary
Summary written by software, from pages 1 to 27 of 40. Check the regulator's original before you rely on it.
This is MERC's Statement of Reasons (SoR) for the Maharashtra Electricity Regulatory Commission (Distribution Open Access) (Second Amendment) Regulations, 2023, dated 10 November 2023 (p1). It records the public consultation on the draft Second Amendment and explains the Commission's decisions clause by clause, with modified regulatory text quoted in place. It matters because it is the reasoning trail for the final amendment aligning MERC's Distribution Open Access Regulations, 2016 with the Ministry of Power's Electricity (Promoting Renewable Energy Through Green Energy Open Access) Rules, 2022 and their January and June 2023 amendments (p1–2).
After the introduction, which sets out the 2016 principal regulations, the 2019 First Amendment, publication of the draft and Explanatory Memorandum on 5 August 2023, and the comment process ending 4 September 2023 (p1–2), Chapter 1 runs through the amendment clause by clause. It deals with: the definition of 'Entity' and the 100 kW eligibility threshold, including special treatment of captive and group-captive consumers (pp3–6); new definitions of Green Ammonia and Green Hydrogen, including emission criteria (pp6–7); the broad definition of Renewable/Green Energy (pp7–8); amendments to Regulation 3 on GEOA eligibility, multiple connections, resultant power flow, 12-time-block consumption stability, mandatory green attributes and simultaneous rooftop renewable systems with open access (pp8–18); Central Nodal Agency procedures in Regulations 4.1 and 8.1, and nodal agency roles for STU/MSLDC (pp18–21); exemptions from cross-subsidy surcharge for waste-to-energy and green hydrogen/ammonia, with the proposed 12-year CSS cap deleted (pp21–24); additional-surcharge exemptions, including for fixed-charge-paying GEOA consumers and offshore wind commissioned by December 2032, plus open-access and transmission charge clarifications (pp24–27); and the ToD-meter route for GEOA consumers below 1 MW (p27).
The document lists Chapter 2, 'Additional Points', and Annexure-I at p2.
Read with this
The regulation
- Dated 30 Mar 2016Distribution Open Access Regulations, 2016
Amendments and corrections
Commencement notices and reasons
Other copies of these documents (1)
- Dated 30 Mar 2016Distribution Open Access Regulations, 2016
8 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft, 2 drafts or notices on a draft not held as English text and 1 copy in another language.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.