APERC · Andhra Pradesh Electricity Regulatory Commission
Green Energy Open Access, Charges and Banking Regulation, 2024 — Consolidated (First and Second Amendments)
Andhra Pradesh Electricity Regulatory Commission (Green Energy Open Access, Charges, and Banking ) Regulation, 2024
Consolidated copyDated 1 May 2024Regulation No 3 of 2024 dated 01.05.2024
A consolidated copy of the Green Energy Open Access, Charges and Banking Regulation, 2024, published by APERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is APERC's consolidated green energy open access (GEOA) regulation for Andhra Pradesh — Regulation No. 3 of 2024, signed at Hyderabad on 01.05.2024 and in force from the date of its Gazette publication, which is not printed (p2, p21). The text has been updated to carry two amendments: the First Amendment (Reg. No. 11 of 2025, dated 08-12-2025) and the Second Amendment (Reg. No. 2 of 2026, dated 21-05-2026), both marked against the clauses they change (p1, p3–17).
The preamble ties it to the national 500 GW renewables target and the Ministry of Power's Green Energy Open Access Rules, 2022, and states that it supersedes all earlier APERC regulations, stipulations, guidelines and directions on green energy open access (p2–3), subject to a savings clause for actions already taken (p21).
Regulation 2 defines the working vocabulary, including who counts as an 'Entity' — a consumer with contracted demand or sanctioned load of at least 100 kW, singly or aggregated across connections in one division, with no load limit for captive consumers and no DISCOM supply agreement required (p3–4). Regulations 3 to 7 set eligibility and system criteria: long-term, medium-term and short-term categories by duration; priority of green over fossil-fuel open access; and a curtailment order favouring long-term, permanent-connection, bilateral green transactions, with EV charging stations expressly allowed to buy through GEOA (p6–8).
Regulations 8 to 11 cover process and settlement: APSLDC as State Nodal Agency for short-term and STU for long- and medium-term; applications via SNAs or the central single-window portal; SNA procedures to be filed with the Commission within 30 days, with Regulation 2005 procedures used in the interim (p8–9); connectivity under Regulation No. 3 of 2017; 15-minute (or aggregated 30-minute) energy settlement; treatment of non-colocated renewable hybrid projects as a single project; metering under the CEA metering regulations with a smart meter mandatory for LT consumers/prosumers (p9–12).
Regulation 12 lists the charge heads — transmission, wheeling, cross-subsidy and additional surcharge, standby, banking, SLDC fees, deviation, reactive energy, losses and a term-based processing fee — and Regulation 13 sets out the surcharge exemptions, including captive plants, waste-to-energy, offshore wind and, per the Second Amendment, green hydrogen, solar module, wind turbine and battery manufacturing projects under GO.Ms.No.37 dated 30.10.2024 (p12–16).
Regulation 14 is the banking regime: monthly cycle, banking charge in kind, a cap on banked energy relative to DISCOM monthly consumption, treatment of lapsed energy and RECs for it, time-of-day settlement rules, and an annual SLDC grid-level banking capacity study (p17–19). Later clauses cover green certificates and RECs, collection and disbursement of charges, dispute resolution, and the Commission's powers to relax, direct, amend, review and remove difficulties, closing with savings provisions that protect existing agreements (p19–21).
Read with this
The regulation
- Dated 1 May 2024Green Energy Open Access, Charges and Banking Regulation, 2024
Commencement notices and reasons
Procedures and orders made under it
- Dated 1 May 2024Order dated 01-05-2024
Proposed changes (drafts with no final yet)
Earlier drafts
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.