Green Energy Open Access, Charges and Banking Regulation, 2024

Andhra Pradesh Electricity Regulatory Commission (Green Energy Open Access, Charges, and Banking ) Regulation, 2024

RegulationDated 1 May 2024Published in the Gazette 2 May 2024Lr. No. APERC/Secy/F.No. S-19(Vol-III)/D.No.1006 dated 02-05-2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

Andhra Pradesh's Green Energy Open Access Regulation (Regulation No. 3 of 2024, published in the A.P. Gazette of 2 May 2024) is the Commission's principal framework for allowing open access to renewable generation over the intra-state transmission and distribution network (p1). The preamble (p1–2) anchors it to India's 2070 carbon-neutrality goal, the 500 GW renewables target for 2030 and the Ministry of Power's 2022 Green Energy Open Access Rules; it is made under s.86(1)(e) read with ss.181, 39(2)(d), 40(c), 42(2),(3) and 86(1)(c) of the Electricity Act 2003, follows the Commission's order of 1 May 2024 disposing of objections, takes effect from Gazette publication and extends to the whole State (p2).

Clauses 1–2 (p2–4) give the short title, extent, supersession of earlier green-open-access instruments, and definitions — including the 'Entity' threshold that fixes who may seek green energy open access (GEOA).

Clauses 3–7 (p4–6) set the eligibility and priority architecture: criteria for allowing open access, long/medium/short-term categorisation by duration, priority of green over fossil-based open access, preference and curtailment order among GEOA consumers, and eligibility bars such as insolvency, outstanding dues or pending theft cases.

Clauses 8–11 (p6–8) allocate nodal-agency roles — APSLDC for short-term, STU for long- and medium-term — require the nodal agencies to publish procedures and timelines within 30 days while APERC's 2005 Open Access Regulation governs in the interim, and deal with connectivity, block-wise energy settlement and deemed-scheduled energy for small capacities, treatment of existing consumers, and metering.

Clauses 12–17 (p8–11) specify the charges leviable (transmission, wheeling, cross-subsidy and additional surcharge, standby, banking, SLDC, deviation, reactive energy, losses and processing fees), the exemptions from cross-subsidy and additional surcharge, the banking regime (monthly cycle, charges in kind, a cap on banked energy, ToD-slot rules and settlement priority), green certificates and RECs, collection and disbursement, and dispute resolution. Clauses 18–22 (p12) are the machinery provisions: power to relax, to issue directions, to amend and review, to remove difficulties, and savings.

Standard name
Green Energy Open Access Regulations, Energy Banking
Primary topics
Green energy open access, Energy banking, Open access charges

Read with this

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of APERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.