APERC · Andhra Pradesh Electricity Regulatory Commission

Green Energy Open Access, Charges and Banking Regulation, 2023 — Draft

Andhra Pradesh Electricity Regulatory Commission (Green Energy Open Access, Charges, and Banking ) Regulation, 2023

Draft regulationDated 30 Sep 2023

Draft

A proposal that has since been finalised as the Green Energy Open Access, Charges and Banking Regulation, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the draft Andhra Pradesh Electricity Regulatory Commission (Green Energy Open Access, Charges, and Banking) Regulation, 2023, issued in draft with its regulation number left blank and dated 30.09.2023 at Hyderabad (p1, p10). It builds the state framework for green energy open access (GEOA) that the Ministry of Power's Electricity (Promotion of Renewable Energy Through Green Energy Open Access) Rules, 2022 call for, and is made under s.86(1)(e) read with ss.181, 39(2)(d), 40(c), 42(2,3) and 86(1)(c) of the Electricity Act, 2003 (p1).

Eligibility and priority: it extends to the whole State (p2) and to "entities" — consumers with contracted demand or sanctioned load of 100 kW or more, through a single connection or aggregated connections in the same division, with no load limit for captive consumers (p2). Open access is categorised long/medium/short-term by duration; green energy users get priority over fossil-fuel open access in connectivity and in curtailment, with tenure-based preference among green users and first-come-first-served for grant (p4–5).

Institutions and process: APSLDC acts as State Nodal Agency for short-term GEOA and the STU for long- and medium-term; applications go to them or through the Central Nodal Agency's single-window portal, and the SNAs must frame procedures and timelines within 30 days of gazette notification (p5–6).

Charges: clause 12 lists transmission, wheeling, cross-subsidy, standby, banking, SLDC, scheduling/deviation, reactive-energy and loss charges, plus a processing fee, most of them left to other APERC regulations and orders (p6–7). Clause 13 governs cross-subsidy and additional surcharges and the categories exempt from them (p7–8).

Banking is confined to wind, solar and mini hydel on a monthly billing cycle, with in-kind charges, a cap on banked energy, peak-hour conditions and a defined settlement order, with SLDC maintaining the accounts (p8–9). The closing clauses cover annual green certificates issued by the licensee, collection and disbursement of charges through SNAs, dispute resolution, power to relax, savings and removal of difficulties (p9–10).

Standard name
Green Energy Open Access Regulations, Energy Banking
Primary topics
Green energy open access, Open access charges, Energy banking

Read with this

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗