APERC · Andhra Pradesh Electricity Regulatory Commission
Green Energy Open Access, Charges and Banking Regulation, 2024 — Second Amendment, 2026 — Statement of Reasons
Second Amendment to the Andhra Pradesh Electricity Regulatory Commission (Green Energy Open Access, Charges, and Banking) Regulation, 2024 (Regulation No. 3 of 2024)
Statement of reasonsDated 8 May 2026Regulation No. 02 of 2026 dated 08.05.2026
The commission's reasons for the Green Energy Open Access, Charges and Banking Regulation, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the APERC's Statement of Reasons and Order, dated 08.05.2026, disposing of stakeholder objections to the draft Second Amendment to the APERC (Green Energy Open Access, Charges and Banking) Regulation, 2024 (Regulation No. 3 of 2024). The operative outcome is issued as Regulation No. 02 of 2026 and printed as Annexure II (pp11-13). The Principal Regulation was gazetted on 02.05.2024 and first amended on 04.12.2025; the draft second amendment was published for comment by notice dated 19.02.2026 (p1).
The bulk of the document (pp2-9) works through five issues. On the new definition of 'Renewable Hybrid Energy Project', the Commission keeps the draft, allowing components at the same or different interconnection points and retaining the minimum CUF condition over developers' objections (pp2-4). On non-colocated hybrid projects, it confirms they are treated as a single generating project for scheduling, with schedules furnished source-wise and capped at hybrid capacity, and connectivity permitted anywhere in the State subject to technical feasibility (pp4-5). It clarifies metering at each source's interconnection point (p13). It retains the distribution/wheeling charge exemption where injection and drawal are at the same voltage level, and applies wheeling charges and loss allocation component-wise where hybrid components sit at different voltage levels (pp6-8). It replaces the fifth proviso to Clause 13 of the First Amendment so that cross-subsidy and additional surcharge waivers for green hydrogen, solar module, wind turbine and battery manufacturing projects follow the period in GO.Ms.No.37 dated 30.10.2024 rather than a flat ten years (pp8-9). It declines to introduce connectivity charges in this amendment, pointing to a future intra-state GNA regulation (p9). Annexure I lists the objectors (p10).
Read with this
The regulation
- Dated 1 May 2024Green Energy Open Access, Charges and Banking Regulation, 2024
Commencement notices and reasons
Procedures and orders made under it
- Dated 1 May 2024Order dated 01-05-2024
Consolidated copies, for reference (1)
Proposed changes (drafts with no final yet)
Earlier drafts
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.