Green Energy Open Access, Charges and Banking Regulation, 2024 — Second Amendment, 2026 — Statement of Reasons

Second Amendment to the Andhra Pradesh Electricity Regulatory Commission (Green Energy Open Access, Charges, and Banking) Regulation, 2024 (Regulation No. 3 of 2024)

Statement of reasonsDated 8 May 2026Regulation No. 02 of 2026 dated 08.05.2026

The commission's reasons for the Green Energy Open Access, Charges and Banking Regulation, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the APERC's Statement of Reasons and Order, dated 08.05.2026, disposing of stakeholder objections to the draft Second Amendment to the APERC (Green Energy Open Access, Charges and Banking) Regulation, 2024 (Regulation No. 3 of 2024). The operative outcome is issued as Regulation No. 02 of 2026 and printed as Annexure II (pp11-13). The Principal Regulation was gazetted on 02.05.2024 and first amended on 04.12.2025; the draft second amendment was published for comment by notice dated 19.02.2026 (p1).

The bulk of the document (pp2-9) works through five issues. On the new definition of 'Renewable Hybrid Energy Project', the Commission keeps the draft, allowing components at the same or different interconnection points and retaining the minimum CUF condition over developers' objections (pp2-4). On non-colocated hybrid projects, it confirms they are treated as a single generating project for scheduling, with schedules furnished source-wise and capped at hybrid capacity, and connectivity permitted anywhere in the State subject to technical feasibility (pp4-5). It clarifies metering at each source's interconnection point (p13). It retains the distribution/wheeling charge exemption where injection and drawal are at the same voltage level, and applies wheeling charges and loss allocation component-wise where hybrid components sit at different voltage levels (pp6-8). It replaces the fifth proviso to Clause 13 of the First Amendment so that cross-subsidy and additional surcharge waivers for green hydrogen, solar module, wind turbine and battery manufacturing projects follow the period in GO.Ms.No.37 dated 30.10.2024 rather than a flat ten years (pp8-9). It declines to introduce connectivity charges in this amendment, pointing to a future intra-state GNA regulation (p9). Annexure I lists the objectors (p10).

Standard name
Green Energy Open Access Regulations
Primary topics
Green energy open access, Open access charges, Scheduling and despatch

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Proposed changes (drafts with no final yet)

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document