Order dated 01-05-2024

OrderDated 1 May 2024

Made under the Green Energy Open Access, Charges and Banking Regulation, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software, from pages 1 to 32 of 54. Check the regulator's original before you rely on it.

This is the APERC order dated 1 May 2024 finalising the APERC (Green Energy Open Access, Charges, and Banking) Regulation, 2024 (Regulation No. 3 of 2024). It is structured as a clause-wise record of the 2023 draft Regulation: each clause, the stakeholder comments on it, and the Commission's analysis and decision, usually with a modified clause (p1–2). The pages cover clauses 1–14, beginning with short title, commencement and extent (p2–4), then definitions of banking, entity, green energy, renewable sources, rules and standby charges (p4–9). It sets criteria and categorisation for green energy open access, priority over fossil-based plants, preference and curtailment priority, eligibility, nodal agency procedure, connectivity and energy settlement, treatment of existing entities, metering, charges, cross-subsidy and additional surcharge, and banking (p9–32). Key decisions include: the Regulation comes into force on Gazette publication (p18); existing APERC Open Access Regulation 2005 procedures are interim pending GEOA procedures (p17–18); settlements follow Regulation 2 of 2006 but banking follows this Regulation (p20); existing agreements continue, but renewal after expiry is governed by this Regulation (p21–22); charges such as transmission, wheeling, cross-subsidy surcharge, standby, DSM, reactive energy and processing fee are retained or modified with no general exemption (p23–30); and banking is monthly, with lapse of unused energy and defined settlement priority (p31–32).

Read with this

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document