APERC · Andhra Pradesh Electricity Regulatory Commission
Green Energy Open Access, Charges and Banking Regulation, 2024 — First Amendment, 2025 — Draft
First Amendment to the Andhra Pradesh Electricity Regulatory Commission (Green Energy Open Access, Charges, and Banking) Regulation, 2024 (Regulation No. 3 of 2024)
Draft amendmentDated 26 Mar 2025
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft first amendment to APERC's Green Energy Open Access, Charges, and Banking Regulation, 2024 (Regulation No. 3 of 2024), signed at Kurnool on 26.03.2025 (p5).
The introduction (pp1–3) explains the trigger: the Principal Regulation was gazetted on 02.05.2024, and the Government of Andhra Pradesh released its Integrated Clean Energy (ICE) Policy on 16.10.2024, targeting 50% non-fossil capacity by 2030 and net-zero by 2047. The GoAP Energy Department then wrote to the Commission under Section 108 of the Electricity Act, 2003, proposing three changes — allowing EV charging stations to buy power through Green Open Access, a reworked banking regime with defined hours of supply and an annual SLDC grid study, and surcharge exemptions for green hydrogen, solar module, wind turbine and battery manufacturing projects (pp1–3).
The operative clauses follow (pp3–5). Clause 1 gives the short title, state-wide extent and commencement on Gazette publication. Clause 2 inserts a proviso in Clause 7 for EV charging stations. Clause 3 substitutes Clause 9, providing connectivity for new green energy generators, 15-minute block-wise settlement against day-ahead schedules, banking of excess or under-drawn energy, a deemed-scheduled fallback where block-wise settlement is impossible, and settlement of wind and solar deviations under CERC DSM Regulations until APERC issues its own. Clause 4 confines the framework to new and capacity-expansion applications. Clause 5 adds a proviso to Clause 13 granting the surcharge exemptions for ten years from commissioning while GO.Ms.No.37 of 30.10.2024 operates. Clause 6 substitutes Clause 14.4, setting the hours of supply with effect from 01.04.2026, TOD-matched banking and drawal rules, a bar on drawing banked peak energy while R&C measures are in force, and the yearly grid-level study that fixes the state banking limit (pp4–5).
Read with this
The regulation
- Dated 1 May 2024Green Energy Open Access, Charges and Banking Regulation, 2024
Commencement notices and reasons
Procedures and orders made under it
- Dated 1 May 2024Order dated 01-05-2024
Consolidated copies, for reference (1)
Earlier drafts
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.