Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Statement of Reasons (SoR) for the AERC (Electricity Supply Code) (Sixth Amendment) Regulations, 2023, issued by the Assam Electricity Regulatory Commission on 23.06.2023. It explains why the Commission is amending the 2017 Supply Code to require municipal Holding/Assessment Numbers to be linked with APDCL consumer numbers in urban local body (ULB) areas of Assam (p1).
Part A sets out the background: a State Government directive of 13.01.2023 sought linking for GMC areas; the Commission treated it as a Section 108 direction and made the Fifth Amendment to Regulation 4.2 by order dated 17.01.2023. A second directive of 19.04.2023 extended the idea to ULB areas statewide. The draft Sixth Amendment was published for comments by 25 May 2023 and put on the Commission's website; no comments were received, so a public hearing was held on 23 June 2023 (p1–2).
Part B summarizes objections from two consumer groups, AAECA and Bidyut Grahak Mancha. They argued that floods disrupted participation, the Central Electricity Supply Code does not require such linking, holding numbers are a municipal matter, the change could harass poor consumers and occupiers, it should apply only to existing consumers, and it could burden the licensee (p2–3). The State Government replied that the aim is to detect ghost consumers and refine the ULB database, and APDCL said it had no objection (p3–4).
Part C records the Commission's analysis: it rejects the flood-related objection, finds no evidence of harassment, notes APDCL did not support the overburden claim, says uniform rules apply to all economic sections, accepts the State's stated purpose, and decides not to drop the amendment (p4–5). Parts D–E thank stakeholders and direct that the draft amendments be finalized and notified in the Official Gazette (p5). Annexure I lists the persons who attended the 23.06.2023 hearing (p6). The Gazette date is not printed.
Read with this
The regulation
- Dated 6 Nov 2017Electricity Supply Code and Related Matters Regulations, 2017
Amendments and corrections
- Dated 20 Jan 2018Electricity Supply Code and Related Matters Regulations, 2017 — Corrigendum, 2018
- Dated 3 Jan 2019Electricity Supply Code Regulations, 2017 — First Amendment, 2018
- Dated 17 Mar 2020Electricity Supply Code, 2017 — Second Amendment, 2020
- Dated 16 Oct 2020Electricity Supply Code (Third Amendment) Regulations, 2020
- Dated 9 Apr 2022Electricity Supply Code Regulations 2017 — Fourth Amendment, 2022
- Dated 3 Jul 2023Electricity Supply Code Regulations, 2017 — Sixth Amendment, 2023
- Dated 21 Oct 2024Electricity Supply Code (Seventh Amendment) Regulations, 2024
- Dated 4 Aug 2026Electricity Supply Code (Eighth Amendment) Regulations, 2026
Commencement notices and reasons
- Dated 24 Oct 2017Electricity Supply Code and related matters Regulations, 2017 — Statement of Objects and Reasons
- Dated 6 Apr 2022Electricity Supply Code Regulations 2017 — Fourth Amendment, 2021 — Statement of Objects & Reasons
- Dated 4 Aug 2026Electricity Supply Code Regulations, 2017 — Eighth Amendment, 2026 — Statement of Reasons
Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.