Skip to content

AERC · Assam Electricity Regulatory Commission

Electricity Supply Code (Eighth Amendment) Regulations, 2026

AERC (Electricity Supply Code) (Eighth Amendment) Regulations, 2026

AmendmentDated 4 Aug 2026Published in the Gazette 7 Aug 2026

Amends the Electricity Supply Code and Related Matters Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aerc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Eighth Amendment to the AERC (Electricity Supply Code) Regulations, 2017, notified by the Assam Electricity Regulatory Commission on 4 August 2026 and gazetted on 7 August 2026, from which date it comes into force (p1). It makes three substantive changes to the Principal Regulations and adds one new form.

Regulation 2 rewrites sub-regulation 3.9.1(bb) on the cost of service connection (pp1–2). It requires the distribution licensee to publish and maintain a schedule of connection charges for new connections up to 150 kW, to determine charges for electrified areas from a schedule of pre-defined charges approved by the Commission, and to update that schedule with prior Commission approval. For HT applications above 150 kW and up to 33 kV it allows a provisional deposit pending a detailed estimate, with the balance paid and any excess refunded or adjusted. The pre-defined mechanism is explicitly voluntary — applicants may stay on the existing actual-cost route — deficits under it cannot be recovered through the Annual True-up, and it is unavailable where works involve railway or National/State Highway crossings, forest land, wetlands, reserve areas or any other area needing statutory clearance, where an estimate follows physical site inspection.

Regulation 3 replaces sub-regulation 4.1.1(b) to list what an application form set may contain, and inserts provisos allowing a Self-Declaration in the Annexure-IA format in place of a Licensed Electrical Contractor's Test Report for LT connections up to 30 kW, with the licensee free to test or inspect before energisation against the CEA Safety Regulations, 2023 (pp2–3).

Regulation 4 inserts provisos after 4.1.3 permitting the licensee to dispense with the initial site inspection for LT connections up to 30 kW, while preserving its right to inspect at any stage, providing for rejection of applications based on false particulars after a hearing, for rectification of minor discrepancies, and for refund of refundable amounts within sixty (60) days of rejection (pp3–4).

Annexure-IA (pp5–7) sets out the Self-Declaration format, covering applicant categories, confirmation that wiring has been tested, ELCB/MCB/MCCB/RCCB and earthing undertakings, indemnity of the licensee, and acknowledgements on inspection, safety-law compliance and consequences of false information.

Standard name
Electricity Supply Code

Read with this

Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.