Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Eighth Amendment to the AERC (Electricity Supply Code) Regulations, 2017, notified by the Assam Electricity Regulatory Commission on 4 August 2026 and gazetted on 7 August 2026, from which date it comes into force (p1). It makes three substantive changes to the Principal Regulations and adds one new form.
Regulation 2 rewrites sub-regulation 3.9.1(bb) on the cost of service connection (pp1–2). It requires the distribution licensee to publish and maintain a schedule of connection charges for new connections up to 150 kW, to determine charges for electrified areas from a schedule of pre-defined charges approved by the Commission, and to update that schedule with prior Commission approval. For HT applications above 150 kW and up to 33 kV it allows a provisional deposit pending a detailed estimate, with the balance paid and any excess refunded or adjusted. The pre-defined mechanism is explicitly voluntary — applicants may stay on the existing actual-cost route — deficits under it cannot be recovered through the Annual True-up, and it is unavailable where works involve railway or National/State Highway crossings, forest land, wetlands, reserve areas or any other area needing statutory clearance, where an estimate follows physical site inspection.
Regulation 3 replaces sub-regulation 4.1.1(b) to list what an application form set may contain, and inserts provisos allowing a Self-Declaration in the Annexure-IA format in place of a Licensed Electrical Contractor's Test Report for LT connections up to 30 kW, with the licensee free to test or inspect before energisation against the CEA Safety Regulations, 2023 (pp2–3).
Regulation 4 inserts provisos after 4.1.3 permitting the licensee to dispense with the initial site inspection for LT connections up to 30 kW, while preserving its right to inspect at any stage, providing for rejection of applications based on false particulars after a hearing, for rectification of minor discrepancies, and for refund of refundable amounts within sixty (60) days of rejection (pp3–4).
Annexure-IA (pp5–7) sets out the Self-Declaration format, covering applicant categories, confirmation that wiring has been tested, ELCB/MCB/MCCB/RCCB and earthing undertakings, indemnity of the licensee, and acknowledgements on inspection, safety-law compliance and consequences of false information.
Read with this
The regulation
- Dated 6 Nov 2017Electricity Supply Code and Related Matters Regulations, 2017
Amendments and corrections
- Dated 20 Jan 2018Electricity Supply Code and Related Matters Regulations, 2017 — Corrigendum, 2018
- Dated 3 Jan 2019Electricity Supply Code Regulations, 2017 — First Amendment, 2018
- Dated 17 Mar 2020Electricity Supply Code, 2017 — Second Amendment, 2020
- Dated 16 Oct 2020Electricity Supply Code (Third Amendment) Regulations, 2020
- Dated 9 Apr 2022Electricity Supply Code Regulations 2017 — Fourth Amendment, 2022
- Dated 3 Jul 2023Electricity Supply Code Regulations, 2017 — Sixth Amendment, 2023
- Dated 21 Oct 2024Electricity Supply Code (Seventh Amendment) Regulations, 2024
Commencement notices and reasons
- Dated 24 Oct 2017Electricity Supply Code and related matters Regulations, 2017 — Statement of Objects and Reasons
- Dated 6 Apr 2022Electricity Supply Code Regulations 2017 — Fourth Amendment, 2021 — Statement of Objects & Reasons
- Dated 23 Jun 2023Electricity Supply Code (Sixth Amendment) Regulations, 2023 — Statement of Reasons
- Dated 4 Aug 2026Electricity Supply Code Regulations, 2017 — Eighth Amendment, 2026 — Statement of Reasons
Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.