Skip to content

AERC · Assam Electricity Regulatory Commission

Electricity Supply Code Regulations 2017 — Fourth Amendment, 2021 — Statement of Objects & Reasons

Assam Electricity Regulatory Commission (Electricity Supply Code)Regulations 2017 (Fourth Amendment), 2021 — Statement of Objects & Reasons

Statement of reasonsDated 6 Apr 2022AERC 280/2007/PART-I/186 dated 06.04.2022

The commission's reasons for the Electricity Supply Code and Related Matters Regulations, 2017 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aerc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

What it is. This is the Assam Electricity Regulatory Commission's Statement of Objects and Reasons for the fourth amendment to the AERC (Electricity Supply Code) Regulations, 2017, signed by the Chairperson and two Members at Guwahati on 6 April 2022 (p1, p7). It is a consultation record rather than the amendment text — paragraph 4 records only that the finalised amendment "will be notified in the Official Gazette" (p7).

Background (paras 1.1–1.7, pp1–2). The Supply Code was notified on 18 November 2017 and amended in 2018 and 2020; it sets out the rights and obligations of licensees and consumers and the practices, standards and norms a licensee must follow. The stated trigger for this amendment is the Ministry of Power's Electricity (Rights of Consumers) Rules, 2020 (G.S.R. 818(E) of 31 December 2020), which added provisions on rights and obligations, new connections, metering, billing and payment. The Commission invited stakeholder suggestions by newspaper notice (by 30.09.2021), published the draft amendment on 15 December 2021 for comments by 21 January 2022, received comments from seven stakeholders, and held a public hearing on 29 March 2022.

Comments and decisions (paras 2.1–2.17, pp2–7). The bulk of the document takes each proposed amendment in turn — frequency, supply voltage for different connected loads, contracted load/billing demand, the licensee's obligation to extend the distribution system, conditions for grant of connection, separate meters with separate points of supply, group supply, application forms, mode of payment, meter-reading schedules, multi-consumer complex billing, utilisation of amounts received, recovery of arrears, inspection/search/seizure, and disconnection — recording the objections filed (largely by APDCL, FINER, ABITA and an SAC member) with the Commission's reasoning. Outcomes vary: some amendments are retained unchanged, some redrafted, some suggestions accepted outright, and at least one dropped in favour of the existing regulation.

Points to note. The increase in the LT connection limit is to be implemented with effect from 01.04.2023 rather than immediately (p3). Paragraph numbering jumps from 2.11 to 2.14 (pp5–6). The title calls the instrument the "(Fourth Amendment), 2021" even though the SoR is dated 2022 (p1).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Billing and payment

Read with this

Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aerc.gov.in ↗

Report an issue with this document