AERC · Assam Electricity Regulatory Commission
Electricity Supply Code Regulations 2017 — Fourth Amendment, 2021 — Statement of Objects & Reasons
Assam Electricity Regulatory Commission (Electricity Supply Code)Regulations 2017 (Fourth Amendment), 2021 — Statement of Objects & Reasons
Statement of reasonsDated 6 Apr 2022AERC 280/2007/PART-I/186 dated 06.04.2022
The commission's reasons for the Electricity Supply Code and Related Matters Regulations, 2017 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
What it is. This is the Assam Electricity Regulatory Commission's Statement of Objects and Reasons for the fourth amendment to the AERC (Electricity Supply Code) Regulations, 2017, signed by the Chairperson and two Members at Guwahati on 6 April 2022 (p1, p7). It is a consultation record rather than the amendment text — paragraph 4 records only that the finalised amendment "will be notified in the Official Gazette" (p7).
Background (paras 1.1–1.7, pp1–2). The Supply Code was notified on 18 November 2017 and amended in 2018 and 2020; it sets out the rights and obligations of licensees and consumers and the practices, standards and norms a licensee must follow. The stated trigger for this amendment is the Ministry of Power's Electricity (Rights of Consumers) Rules, 2020 (G.S.R. 818(E) of 31 December 2020), which added provisions on rights and obligations, new connections, metering, billing and payment. The Commission invited stakeholder suggestions by newspaper notice (by 30.09.2021), published the draft amendment on 15 December 2021 for comments by 21 January 2022, received comments from seven stakeholders, and held a public hearing on 29 March 2022.
Comments and decisions (paras 2.1–2.17, pp2–7). The bulk of the document takes each proposed amendment in turn — frequency, supply voltage for different connected loads, contracted load/billing demand, the licensee's obligation to extend the distribution system, conditions for grant of connection, separate meters with separate points of supply, group supply, application forms, mode of payment, meter-reading schedules, multi-consumer complex billing, utilisation of amounts received, recovery of arrears, inspection/search/seizure, and disconnection — recording the objections filed (largely by APDCL, FINER, ABITA and an SAC member) with the Commission's reasoning. Outcomes vary: some amendments are retained unchanged, some redrafted, some suggestions accepted outright, and at least one dropped in favour of the existing regulation.
Points to note. The increase in the LT connection limit is to be implemented with effect from 01.04.2023 rather than immediately (p3). Paragraph numbering jumps from 2.11 to 2.14 (pp5–6). The title calls the instrument the "(Fourth Amendment), 2021" even though the SoR is dated 2022 (p1).
Read with this
The regulation
- Dated 6 Nov 2017Electricity Supply Code and Related Matters Regulations, 2017
Amendments and corrections
- Dated 20 Jan 2018Electricity Supply Code and Related Matters Regulations, 2017 — Corrigendum, 2018
- Dated 3 Jan 2019Electricity Supply Code Regulations, 2017 — First Amendment, 2018
- Dated 17 Mar 2020Electricity Supply Code, 2017 — Second Amendment, 2020
- Dated 16 Oct 2020Electricity Supply Code (Third Amendment) Regulations, 2020
- Dated 9 Apr 2022Electricity Supply Code Regulations 2017 — Fourth Amendment, 2022
- Dated 3 Jul 2023Electricity Supply Code Regulations, 2017 — Sixth Amendment, 2023
- Dated 21 Oct 2024Electricity Supply Code (Seventh Amendment) Regulations, 2024
- Dated 4 Aug 2026Electricity Supply Code (Eighth Amendment) Regulations, 2026
Commencement notices and reasons
- Dated 24 Oct 2017Electricity Supply Code and related matters Regulations, 2017 — Statement of Objects and Reasons
- Dated 23 Jun 2023Electricity Supply Code (Sixth Amendment) Regulations, 2023 — Statement of Reasons
- Dated 4 Aug 2026Electricity Supply Code Regulations, 2017 — Eighth Amendment, 2026 — Statement of Reasons
Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.