Skip to content

AERC · Assam Electricity Regulatory Commission

Electricity Supply Code and Related Matters Regulations, 2017

AERC (Electricity Supply Code and Related Matters) Regulations, 2017

RegulationDated 6 Nov 2017Published in the Gazette 18 Nov 2017AERC.28A/2017/S6 dated 6th November,2017

7 amendments to it are on Voltaic, the latest dated 4 Aug 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aerc.gov.in ↗

Summary

Summary written by software, from pages 1 to 36 of 217. Check the regulator's original before you rely on it.

This is the Assam Electricity Regulatory Commission's Electricity Supply Code, 2017, notified on 6 November 2017 and published in the Assam Gazette on 18 November 2017, from which date it comes into force (p1). It is made under sections 50 and 181(2)(x) of the Electricity Act 2003 and expressly replaces the earlier Electricity Supply Code and Related Matters Regulations, 2004 (p1).

Chapter I (pp1–13) sets the Code's title, commencement, applicability and definitions. It binds all distribution and retail supply licensees (including deemed licensees), all consumers in Assam, persons exempted under section 13, and cases of unauthorised supply, use, diversion or abstraction (p2). It lists the Code's coverage — connection, disconnection, reconnection, load assessment, load and name changes, metering, billing, payment, and theft/unauthorised use — and says it must be read with four other AERC regulations, with the Code prevailing where they conflict (pp2–4). Definitions run to some 79 items plus interpretation and review clauses (pp4–13).

Chapter II (pp14–18) governs the system of supply: declared frequency and voltage, permissible voltage regulation bands, which voltage class a consumer's connected load attracts, rebates and surcharges for supply at higher or lower voltage than prescribed, contract demand and billing demand, power factor obligations, supply to energy-intensive industry, phase and voltage balancing limits, and consumer classification linked to the Commission's tariff orders.

Chapter III (pp19–28) covers new power supply: the licensee's duty to supply, who pays for system extension versus service connection, exceptions from the duty to supply, publication of connection procedure, time limits for each type of connection, grievance redressal routing, penalty for missed timelines, priority and waiting lists, standard cost estimates, consumer-executed works, and special cases such as multi-consumer complexes, group users and occupants of government land.

Chapter IV sets the application machinery: forms and formats, registration, site inspection, sanction of load and its validity, fees, documents required, application processing and queue discipline, wayleave, and the demand note and payment of charges. Appendices I–IV (security deposit norms, estimate norms, activity-wise timelines, miscellaneous charges) and Formats 1–4 are referenced but not included in pages 1–36.

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Billing and payment

Read with this

Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of AERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aerc.gov.in ↗

Report an issue with this document