Electricity Supply Code Regulations, 2017 — Eighth Amendment, 2026 — Statement of Reasons

Statement of Reasons

Statement of reasonsDated 4 Aug 2026No. AERC. 280/2017/Pt III/135 dated 04.08.2026

The commission's reasons for the Electricity Supply Code and Related Matters Regulations, 2017 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aerc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Statement of Reasons (SoR) issued by the Assam Electricity Regulatory Commission alongside the draft AERC (Electricity Supply Code) (Eighth Amendment) Regulations, 2026 (p1). It explains why the 2017 Supply Code — which governs new connections, unauthorised supply and use, diversion, theft and other unauthorised abstraction for all distribution and retail supply licensees, including deemed licensees, and all consumers in Assam — is being amended (p1).

The trigger was a petition from Assam Power Distribution Company Limited (APDCL), following a direction from the Power Department, Government of Assam dated 12.02.2026, to align with the Deregulation Cell, Cabinet Secretariat's push to simplify and speed up electricity connections; APDCL also sought to move the interest on consumer load security deposits from the SBI Base Rate to the RBI Bank Rate (pp1–2). The Commission carried out previous publication, took objections from the All India Manufacturers Organisation and Shri Nilmadhav Deb, and held a public hearing on 21 July 2026 (p2).

The bulk of the document (pp3–15) is a tabulated disposition of every objection and suggestion, APDCL's reply and the Commission's view.

The Analysis and Decision (pp16–20) records the outcome. The Commission allows applicants for new Low Tension connections up to 30 kW to file a Self-Declaration in the prescribed Annexure-IA instead of a Licensed Electrical Contractor's Test Report at application stage, while preserving the licensee's power to inspect and to require testing before energisation (pp16–18). It makes initial site inspection non-mandatory where not needed but expressly preserves the licensee's right to inspect; it adds safeguards against false declarations; it provides for a Commission-approved schedule of pre-defined connection charges published by the licensee, with the existing actual-cost route retained as an option, applicable to LT and HT categories alike, and bars any deficit from being passed on through the Annual True-up (p18). Formats 2(vi) and 4(iv) are left unchanged. The proposal to shift the security-deposit interest benchmark to the RBI Bank Rate is rejected, and the SBI Base Rate provision continues (p19). The draft is finalised with these modifications and Petition No. 6 is to be disposed of by a separate order (p20).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Connection and miscellaneous charges, Security deposit

Read with this

Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aerc.gov.in ↗

Report an issue with this document