Electricity Supply Code and Related Matters Regulations, 2017 — Corrigendum, 2018

Corrigendum of AERC (Electricity Supply Code and Related Matters) Regulations, 2017

CorrigendumDated 20 Jan 2018

Corrects the Electricity Supply Code and Related Matters Regulations, 2017 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aerc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a corrigendum issued by the Assam Electricity Regulatory Commission to fix errors in the AERC (Electricity Supply Code) Regulation, 2017, which was notified in the Assam Gazette on 18 November 2017. The corrigendum was passed on 20 January 2018 and is signed by the Secretary by order of the Commission (p1, p3).

The main body is a numbered correction table (Sl. Nos. 1–10) mapping each faulty clause of the 2017 Code to its corrected reading: cross-references in the definition of 'independent feeder', a transformer capacity entry in Clause 3.9.1(2), Clause 6.2.8.3(c), the Chapter VII heading on theft and unauthorised use of energy, the document list in the new-connection application format (Format-2(II)), and the wording of the meter test certificate in Format-10 (p1–3).

The corrigendum does more than fix typos. It republishes two appendix tables in full as annexures: Appendix I, which sets estimated monthly consumption in kWh per kW of load for each LT and HT consumer category (p4), and Appendix IV, the schedule of general and miscellaneous charges covering registration and processing fees, testing and meter-test charges, meter removal, resealing, disconnection and reconnection, name-change processing, meter security charges and meter rent (p5–8).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, Connection and miscellaneous charges, Billing and payment

Read with this

Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.