AERC · Assam Electricity Regulatory Commission
Electricity Supply Code and Related Matters Regulations, 2017 — Corrigendum, 2018
Corrigendum of AERC (Electricity Supply Code and Related Matters) Regulations, 2017
CorrigendumDated 20 Jan 2018
Corrects the Electricity Supply Code and Related Matters Regulations, 2017 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a corrigendum issued by the Assam Electricity Regulatory Commission to fix errors in the AERC (Electricity Supply Code) Regulation, 2017, which was notified in the Assam Gazette on 18 November 2017. The corrigendum was passed on 20 January 2018 and is signed by the Secretary by order of the Commission (p1, p3).
The main body is a numbered correction table (Sl. Nos. 1–10) mapping each faulty clause of the 2017 Code to its corrected reading: cross-references in the definition of 'independent feeder', a transformer capacity entry in Clause 3.9.1(2), Clause 6.2.8.3(c), the Chapter VII heading on theft and unauthorised use of energy, the document list in the new-connection application format (Format-2(II)), and the wording of the meter test certificate in Format-10 (p1–3).
The corrigendum does more than fix typos. It republishes two appendix tables in full as annexures: Appendix I, which sets estimated monthly consumption in kWh per kW of load for each LT and HT consumer category (p4), and Appendix IV, the schedule of general and miscellaneous charges covering registration and processing fees, testing and meter-test charges, meter removal, resealing, disconnection and reconnection, name-change processing, meter security charges and meter rent (p5–8).
Read with this
The regulation
- Dated 6 Nov 2017Electricity Supply Code and Related Matters Regulations, 2017
Amendments and corrections
- Dated 3 Jan 2019Electricity Supply Code Regulations, 2017 — First Amendment, 2018
- Dated 17 Mar 2020Electricity Supply Code, 2017 — Second Amendment, 2020
- Dated 16 Oct 2020Electricity Supply Code (Third Amendment) Regulations, 2020
- Dated 9 Apr 2022Electricity Supply Code Regulations 2017 — Fourth Amendment, 2022
- Dated 3 Jul 2023Electricity Supply Code Regulations, 2017 — Sixth Amendment, 2023
- Dated 21 Oct 2024Electricity Supply Code (Seventh Amendment) Regulations, 2024
- Dated 4 Aug 2026Electricity Supply Code (Eighth Amendment) Regulations, 2026
Commencement notices and reasons
- Dated 24 Oct 2017Electricity Supply Code and related matters Regulations, 2017 — Statement of Objects and Reasons
- Dated 6 Apr 2022Electricity Supply Code Regulations 2017 — Fourth Amendment, 2021 — Statement of Objects & Reasons
- Dated 23 Jun 2023Electricity Supply Code (Sixth Amendment) Regulations, 2023 — Statement of Reasons
- Dated 4 Aug 2026Electricity Supply Code Regulations, 2017 — Eighth Amendment, 2026 — Statement of Reasons
Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.