The Assam Electricity Regulatory Commission (Electricity Supply Code) (Second Amendment), Regulations, 2020

AmendmentDated 17 Mar 2020Published in the Gazette 26 May 2020No.AERC.280/2007/Part-I/82 dated The 17th March, 2020

Amends the Electricity Supply Code and Related Matters Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aerc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the second amending instrument to the AERC (Electricity Supply Code) Regulations, 2017, issued by the Assam Electricity Regulatory Commission and notified in the Assam Gazette of 26 May 2020 (the notification itself is dated 17 March 2020) (p1). It makes two changes and nothing else.

First, regulation 2.2.3(a) of the Principal Regulations is replaced wholesale, restating how Contract Demand is determined (p1–2). For LT consumers on tariffs without a maximum-demand element, Contract Demand is the connected load of the premises as agreed between consumer and licensee. For LT consumers on MD-based tariffs and for all HT and EHT consumers, Contract Demand follows the agreement and the consumer's installation requirement, and is expressly independent of connected load. Seasonal industries (tea, coffee, rubber and the like) may declare up to two seasonal contract demands a year, one in season and one off season; declarations are made once a year, take effect within three months, bind for at least twelve months, and can be changed where a revised agreement changes connected load (p2).

Second, a new subclause (e) is inserted in regulation 6.3.7.3 (p2), governing billing after a defective meter is replaced: the bill is revised on the higher of the consumption recorded by the existing meter while it was in order or by the new meter, using the procedure in clauses (a) to (c), and the revision is capped at the six months immediately before detection. The regulations commence on Gazette publication (p1).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, Billing and payment, Metering

Read with this

Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.