Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination (Third Amendment) Regulations, 2017 — Draft

Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) (Third Amendment) Regulations, 2017

Draft amendmentDated 10 Mar 2017No. HPERC/428. dated 10th March, 2017

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Himachal Pradesh Electricity Regulatory Commission issued this notification in Shimla on 10 March 2017, publishing draft Third Amendment Regulations to its 2012 renewable-energy tariff regulations (p1). The preamble records that the 2012 RE Regulations were published in the Rajpatra on 17 December 2012; that their control period for small hydro projects (SHPs) is due for review after 31.03.2017; and that the Commission wants to extend the existing framework to facilitate long-term power purchase agreements between renewable projects and the distribution licensee, HPSEBL (p1). The draft is published for objections and suggestions, to be considered after 14 days from publication of the notification in the Rajpatra; comments go to the Secretary, HPERC, Shimla, and the text is on the Commission's website (p1).

Clause 1 names the instrument as the Third Amendment Regulations, 2017 and provides for commencement from Rajpatra publication (p1–2). Clause 2 amends Regulation 1(2) of the 2012 regulations by substituting the control-period endpoint (p2). Clause 3 amends Regulation 9(1): it substitutes the date in that sub-regulation and inserts a proviso that generic levellised SHP tariffs determined before the amendment continue until 30 September 2017 unless amended or revoked earlier (p2).

Clause 4 amends Regulation 17. It replaces the third proviso to Regulation 17(2) so that the Commission may follow Central Commission technology-specific parameters, including capital cost and other terms, mutatis mutandis for smaller capacities, separately for each technology and not exceeding 5 MW for any such technology (p2). It also adds a proviso to Regulation 17(3) allowing the Commission, by suo-moto order, to adopt Central Commission generic levellised tariffs for any period for any or all categories of renewable technologies other than SHPs (p2).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document