Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2012

Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) Regulations, 2012

RegulationDated 17 Dec 2012In force from 18 Dec 2012No. HPERC/428- dated 17th December, 2012

Replaced by Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software, from pages 1 to 40 of 47. Check the regulator's original before you rely on it.

The notification creates a new HPERC framework for promoting renewable generation in Himachal Pradesh and for determining tariffs under the Electricity Act, 2003. The preamble records the earlier 2007 regulations and a 2007 SHP tariff order, the draft regulations published in the Rajpatra on 27 July 2012, and objections/suggestions invited and extended to 15 October 2012 (p1–2). The regulations commence on 18 December 2012, remain in force until 31 March 2017 unless reviewed earlier or extended, and set the SHP control period from 18 December 2012 to 31 March 2017 (p2, p15).

Chapter I defines the key terms—renewable energy generator, SHP up to and including 25 MW, REC mechanism, net saleable energy, interconnection facilities/project line, useful life and others—and sets scope and eligibility. It applies where the Commission determines renewable tariff under section 62 read with section 86, but excludes existing long-term arrangements, projects up to 100 kW, and competitively bid tariffs; it preserves agreements made before the Commission and PPAs approved under the 2007 regulations (p7–8). Technology-specific eligibility covers wind, SHPs, biomass Rankine, non-fossil cogeneration, solar, biomass gasifier and biogas projects (p8–9).

Chapter II sets the promotion route: renewable generators may sell under long-term PPA, REC mechanism or open access, apply for connectivity on prescribed lead times, execute interconnection agreements, share joint evacuation lines, and build/transfer network assets beyond the interconnection point; it also provides for a coordination committee among STU, licensees, HIMURJA and the Directorate of Energy (p10–13).

Chapter III is the tariff-determination core. It covers PPA filing and approval, control/review period, tariff period, single-part levellised design with special fuel-cost treatment, generic and project-specific levellised tariff options, exit options, residual-period tariff after REC sale, capacity-enhancement rules, other renewable technologies, petition requirements and limited review grounds (p14–31).

Chapter IV lays down financial principles: capital cost, treatment of subsidies/incentives/GBI and accelerated depreciation, debt-equity, loan/interest, depreciation, return on equity, working capital, O&M expenses, taxes and duties, rebate, late payment surcharge and ceiling norms (p32–39). Chapter V begins SHP-specific parameters: capacity categories, normative capital cost table and the basis for normative saleable energy.

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Power procurement and PPAs

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.