Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2012 — Second Amendment, 2016 — finalisation order

In the matter of draft amendment Regulations of the Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources and Terms and Conditions for Tariff Determination) (Second Amendment) Regulations, 2016.

OrderDated 30 Nov 2016Published in the Gazette 18 Mar 2016

Replaced by Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017

See that regulation for the date it took effect and for anything it keeps in force.

Read with the Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2012.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is an HPERC order finalising the draft Second Amendment Regulations, 2016 to its 2012 renewable-energy tariff regulations. It responds to references from the State Urban Development Department seeking a tariff and terms for waste-to-energy projects so the State can meet the Swachh Bharat Mission target of processing all solid waste by 2 October 2019 (p1–2).

The order sets out the basis for the amendment. It quotes MoP Tariff Policy para 6.4(1)(i), which requires distribution licensees to procure all power from waste-to-energy plants in the State at a tariff determined under s.62 of the Electricity Act, and para 6.4(2), which excludes such projects from competitive bidding (p1). It also cites para 7.9.7 of HPERC's MYT Tariff Order dated 10 April 2015, recording the Commission's policy to promote waste-to-energy and HPSEBL's purchase of that energy as renewable (p1). Because HPERC lacks its own MSW/RDF norms, it adopts CERC's 2012 RE tariff regulations for technical and financial norms and tariff (p1–2).

On procedure, the draft amendment was notified on 16 March 2016, published in Rajpatra, Himachal Pradesh on 18 March 2016 under s.181(1) of the Electricity Act, and publicised in two newspapers on 20 March 2016 under Rule 3 of the Electricity (Procedure of Previous Publication) Rules, 2005; the Commission also wrote to major stakeholders on 19 March 2016. No objections or suggestions were received in the stipulated period (p2). The draft is therefore finalised without change and approved for notification (p2). The pages do not reproduce the operative amendment text or a final notification/in-force date.

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document