HPERC · Himachal Pradesh Electricity Regulatory Commission
Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2012 — Finalisation Order
In the matter of draft Regulations of the Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources & Terms and Conditions for Tariff Determination), Regulations, 2012.
OrderDated 30 Nov 2016
Replaced by Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017
See that regulation for the date it took effect and for anything it keeps in force.
Read with the Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2012.
Summary
Summary written by software, from pages 1 to 35 of 37. Check the regulator's original before you rely on it.
This is the HPERC order on the draft Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources & Terms and Conditions for Tariff Determination) Regulations, 2012. It records publication of the draft on 27 July 2012, the consultation process, and objections and suggestions received from stakeholders (p1–2). It explains the Commission's general approach: a state-specific RE framework, enabling provisions for technologies other than small hydro, CERC norms as ceiling parameters, and reliance on market options such as REC mechanism and open access (p2–3).
The bulk of the document is a clause-by-clause consideration of stakeholder comments and the Commission's decisions (p4–35). It covers validity of late comments (p4); general comments (p4); date of commencement of operation (p4–5); interconnection point and grid connectivity (p5–6); definition of renewable energy and exclusion of distributed/standalone systems (p6–7); mode of sale (p7); connectivity application timeframes, amended to 24 months for SHPs and 12 months for other technologies (p7–8); coordination committee (p8); REC mechanism (p8); joint PPA approval petitions (p8–9); control period (p9–10); revision of regulations (p10); tariff period (p10); discount factor (p11); generic and project-specific levellised tariffs (p11–18); capacity enhancement (p14–15); tariff for RE other than SHPs (p15–16); review of tariff (p18–20); capital cost (p20–21); sharing of subsidy and CDM benefits (p21–23); loan and finance charges (p24); depreciation (p24–25); return on equity (p25); taxes and duties (p26); rebate and late payment surcharge (p26–27); capital cost and categorisation of SHPs (p27–30); CUF and normative saleable energy (p30–33); and free power (p33–35).
The order largely retains the draft regulations, but makes specific changes: connectivity timelines, exit option for the distribution licensee, pre-tax return on equity, CDM retention by generators, normative subsidy adjustment, and a proviso for residual tariff after capacity enhancement. It is not the final regulation text; it is the reasoned decision record for finalising the 2012 RE tariff regulations.
Read with this
The regulation
Amendments and corrections
- Dated 11 Feb 2015Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2012 — First Amendment, 2015
- Dated 11 Apr 2016Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2012 — Second Amendment, 2016
- Dated 31 Mar 2017Promotion of Generation from Renewable Energy Sources and Tariff Determination (Third Amendment) Regulations, 2017
Commencement notices and reasons
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.