Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2012 — Finalisation Order

In the matter of draft Regulations of the Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources & Terms and Conditions for Tariff Determination), Regulations, 2012.

OrderDated 30 Nov 2016

Replaced by Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2017

See that regulation for the date it took effect and for anything it keeps in force.

Read with the Promotion of Generation from Renewable Energy Sources and Tariff Determination Regulations, 2012.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software, from pages 1 to 35 of 37. Check the regulator's original before you rely on it.

This is the HPERC order on the draft Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the Renewable Energy Sources & Terms and Conditions for Tariff Determination) Regulations, 2012. It records publication of the draft on 27 July 2012, the consultation process, and objections and suggestions received from stakeholders (p1–2). It explains the Commission's general approach: a state-specific RE framework, enabling provisions for technologies other than small hydro, CERC norms as ceiling parameters, and reliance on market options such as REC mechanism and open access (p2–3).

The bulk of the document is a clause-by-clause consideration of stakeholder comments and the Commission's decisions (p4–35). It covers validity of late comments (p4); general comments (p4); date of commencement of operation (p4–5); interconnection point and grid connectivity (p5–6); definition of renewable energy and exclusion of distributed/standalone systems (p6–7); mode of sale (p7); connectivity application timeframes, amended to 24 months for SHPs and 12 months for other technologies (p7–8); coordination committee (p8); REC mechanism (p8); joint PPA approval petitions (p8–9); control period (p9–10); revision of regulations (p10); tariff period (p10); discount factor (p11); generic and project-specific levellised tariffs (p11–18); capacity enhancement (p14–15); tariff for RE other than SHPs (p15–16); review of tariff (p18–20); capital cost (p20–21); sharing of subsidy and CDM benefits (p21–23); loan and finance charges (p24); depreciation (p24–25); return on equity (p25); taxes and duties (p26); rebate and late payment surcharge (p26–27); capital cost and categorisation of SHPs (p27–30); CUF and normative saleable energy (p30–33); and free power (p33–35).

The order largely retains the draft regulations, but makes specific changes: connectivity timelines, exit option for the distribution licensee, pre-tax return on equity, CDM retention by generators, normative subsidy adjustment, and a proviso for residual tariff after capacity enhancement. It is not the final regulation text; it is the reasoned decision record for finalising the 2012 RE tariff regulations.

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Capital cost and investment

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗