Net Metering for Renewable Energy (Second Amendment) Guidelines, 2026

Delhi Electricity Regulatory Commission (Net Metering for Renewable Energy) (Second Amendment) Guidelines, 2026

AmendmentDated 16 Jul 2026F.17(44)/Engg./DERC/2024-25/8208 dated 16/07/2026

Amends the Net Metering for Renewable Energy Regulations, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Delhi Electricity Regulatory Commission issued this amendment on 16 July 2026 under file F.17(44)/Engg./DERC/2024-25/8208. It is the Second Amendment to the Guidelines under the DERC (Net Metering for Renewable Energy) Regulations, 2014 — called in the text the "Principal Guidelines" — and it rebuilds the consumer-facing process for obtaining a net-metered rooftop solar connection in Delhi.

Section 1.0 (p1) names the instrument and brings it into force from the date of issue, applying it to applications pending at any stage as well as to applications received thereafter.

Section 2.0 (p1–2) replaces Guideline 3's three-tier process with a two-stage one: Stage I technical feasibility analysis, and Stage II integrated document verification, inspection and net meter installation. It splits applicants into Route A (domestic consumers using the PM Surya Ghar: Muft Bijli Yojana National Portal) and Route B (everyone else, through the licensee's designated portal or the Delhi State Portal), makes the process end-to-end online, and sets outer time limits for each stage and cumulatively, with feasibility deemed granted if the licensee does not respond in time. Systems up to 10 kW on the same supply type need no feasibility analysis at all. Time taken by the applicant is excluded from the clock, and any deficiency or defect must be communicated in a single consolidated intimation, with minor non-safety deviations expressly not a ground for delay.

Section 3.0 (p2–3) substitutes the provisos dealing with charges so that no application fee for feasibility analysis and no registration charges are payable by domestic consumers for rooftop solar connections up to 10 kW, whether or not they avail PM Surya Ghar benefits.

Section 5.0 (p3) requires the Connection Agreement to be executed digitally on the applicable portal as part of Stage II — by click/tick-box for domestic consumers up to 10 kW, by electronic or digital signature otherwise — mandatorily for all consumer categories and capacities, and deems it the Connection Agreement under Regulation 2(3) of the 2014 Regulations.

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, New connections and load changes, Connection and miscellaneous charges

Read with this

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document