DERC · Delhi Electricity Regulatory Commission
Net Metering for Renewable Energy (Second Amendment) Guidelines, 2026
Delhi Electricity Regulatory Commission (Net Metering for Renewable Energy) (Second Amendment) Guidelines, 2026
AmendmentDated 16 Jul 2026F.17(44)/Engg./DERC/2024-25/8208 dated 16/07/2026
Amends the Net Metering for Renewable Energy Regulations, 2014.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Delhi Electricity Regulatory Commission issued this amendment on 16 July 2026 under file F.17(44)/Engg./DERC/2024-25/8208. It is the Second Amendment to the Guidelines under the DERC (Net Metering for Renewable Energy) Regulations, 2014 — called in the text the "Principal Guidelines" — and it rebuilds the consumer-facing process for obtaining a net-metered rooftop solar connection in Delhi.
Section 1.0 (p1) names the instrument and brings it into force from the date of issue, applying it to applications pending at any stage as well as to applications received thereafter.
Section 2.0 (p1–2) replaces Guideline 3's three-tier process with a two-stage one: Stage I technical feasibility analysis, and Stage II integrated document verification, inspection and net meter installation. It splits applicants into Route A (domestic consumers using the PM Surya Ghar: Muft Bijli Yojana National Portal) and Route B (everyone else, through the licensee's designated portal or the Delhi State Portal), makes the process end-to-end online, and sets outer time limits for each stage and cumulatively, with feasibility deemed granted if the licensee does not respond in time. Systems up to 10 kW on the same supply type need no feasibility analysis at all. Time taken by the applicant is excluded from the clock, and any deficiency or defect must be communicated in a single consolidated intimation, with minor non-safety deviations expressly not a ground for delay.
Section 3.0 (p2–3) substitutes the provisos dealing with charges so that no application fee for feasibility analysis and no registration charges are payable by domestic consumers for rooftop solar connections up to 10 kW, whether or not they avail PM Surya Ghar benefits.
Section 5.0 (p3) requires the Connection Agreement to be executed digitally on the applicable portal as part of Stage II — by click/tick-box for domestic consumers up to 10 kW, by electronic or digital signature otherwise — mandatorily for all consumer categories and capacities, and deems it the Connection Agreement under Regulation 2(3) of the 2014 Regulations.
Read with this
The regulation
- Dated 2 Sep 2014Net Metering for Renewable Energy Regulations, 2014
Amendments and corrections
Procedures and orders made under it
- Dated 31 May 2019Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019
- Dated 24 Jun 2024Peer to Peer Energy Transaction Guidelines, 2024
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 26 May 2023Net Metering for Renewable Energy (First Amendment) Regulations, 2023 — Draft
- Dated 26 May 2023Public notice: Public Notice for Comments on Draft Net Metering for Renewable Energy (First Amendment) Regulations, 2023
- Dated 2 Jul 2024Net Metering for Renewable Energy (First Amendment) Regulations, 2024 — Draft
- Dated 2 Jul 2024Public notice: Net Metering for Renewable Energy (First Amendment) Regulations, 2024 — consultation notice
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.