DERC · Delhi Electricity Regulatory Commission
Net Metering for Renewable Energy (First Amendment) Regulations, 2023 — Draft
Delhi Electricity Regulatory Commission (Net Metering for Renewable Energy) (First Amendment) Regulations, 2023
Draft amendmentDated 26 May 2023F.3(664)/Tariff-Engg./DERC/2021-22/7286 dated 26/05/2023
Draft
A proposal that has since been finalised as the Net Metering for Renewable Energy (First Amendment) Regulations, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft amendment by the Delhi Electricity Regulatory Commission (DERC) to its principal net metering regulations, issued for previous publication in the Delhi Gazette (Extraordinary) (p1). It is signed by the Secretary, DERC, and dated 26 May 2023 (p3).
Clause 1 gives the short title — Delhi Electricity Regulatory Commission (Net Metering for Renewable Energy) (First Amendment) Regulations, 2023 — and provides that it takes effect from the date of notification (p1).
Clause 2 adds three definitions to Regulation 2 of the principal regulations: blockchain, peer-to-peer transaction, and prosumer (p1). Clause 3 inserts a new sub-clause into Regulation 4 allowing prosumers and eligible consumers to sell and purchase electricity mutually through peer-to-peer transactions, with distribution licensees responsible for accounting and billing, and a proviso requiring Delhi DISCOMs to file a petition for determination of transaction charges or fees (p1–2).
Clause 4 substitutes Regulation 10 so that renewable energy systems under net metering, including peer-to-peer transactions, are exempt from wheeling, banking, cross subsidy and other charges until 31 March 2026, unless extended (p2).
Clauses 5 to 7 are housekeeping: they replace the older instruments cited in the principal regulations with their newer versions — the CERC Deviation Settlement Mechanism Regulations, the Delhi Electricity Supply Code and Performance Standards Regulations, the DERC RPO/REC Framework Implementation Regulations and the CERC REC Regulations (p2–3).
Because this is a draft, the peer-to-peer framework and the charge exemption are proposals, not yet in force.
Read with this
The regulation
- Dated 2 Sep 2014Net Metering for Renewable Energy Regulations, 2014
Amendments and corrections
- Dated 26 Jul 2024Net Metering for Renewable Energy (First Amendment) Regulations, 2024
- Dated 2 Aug 2024Net Metering for Renewable Energy Regulations, 2014 — First Amendment, 2024
- Dated 1 May 2025Net Metering for Renewable Energy (First Amendment) Guidelines, 2025
- Dated 16 Jul 2026Net Metering for Renewable Energy (Second Amendment) Guidelines, 2026
Procedures and orders made under it
- Dated 31 May 2019Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019
- Dated 24 Jun 2024Peer to Peer Energy Transaction Guidelines, 2024
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 2 Jul 2024Net Metering for Renewable Energy (First Amendment) Regulations, 2024 — Draft
- Dated 2 Jul 2024Public notice: Net Metering for Renewable Energy (First Amendment) Regulations, 2024 — consultation notice
- Dated 26 May 2023Public notice: Public Notice for Comments on Draft Net Metering for Renewable Energy (First Amendment) Regulations, 2023
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.