Net Metering for Renewable Energy Regulations, 2014 — First Amendment, 2024

Delhi Electricity Regulatory Commission (Net Metering for Renewable Energy) (First Amendment) Regulations, 2024

AmendmentDated 2 Aug 2024Published in the Gazette 5 Aug 2024No. F. F3(629)/Tariff-Engg./DERC/2020-21/6910/808 dated 2nd August, 2024

Amends the Net Metering for Renewable Energy Regulations, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short amending regulation by the Delhi Electricity Regulatory Commission that changes its 2014 net metering regulations for renewable energy. It adds three provisos to Regulation 5(3) of the principal regulations, which governs how a distribution licensee processes an application for a renewable energy system (p2–3).

The first two provisos concern small systems. Technical feasibility studies — and any matching enhancement of the consumer's sanctioned load — are dispensed with for renewable energy systems up to 10 kW on the same supply type (voltage level and phase). The distribution licensee must itself carry out the load enhancement, and must also carry out any distribution infrastructure upgrade, including distribution transformer capacity, needed to accommodate such a system (p2–3). The cost of that infrastructure is recoverable through the licensee's Aggregate Revenue Requirement, subject to the Commission's prudence check (p3).

The third proviso sets a procedural clock: for systems above 10 kW, the licensee must complete technical feasibility within fifteen days of receiving an application that is complete in all respects (p3).

The amendment takes effect from the date of publication in the official Gazette (p2); the notification is dated 2 August 2024 and the gazette carries the identifier SG-DL-E-05082024-256058 on page 1.

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, New connections and load changes, ARR and true-up

Read with this

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document