DERC · Delhi Electricity Regulatory Commission
Net Metering for Renewable Energy (First Amendment) Regulations, 2024 — Draft
Delhi Electricity Regulatory Commission (Net Metering for Renewable Energy) (First Amendment) Regulations, 2024
Draft amendmentDated 2 Jul 2024F.3(629)/Tariff-Engg./DERC/2020-21/6910 dated 2/07/2024
Draft
A proposal that has since been finalised as the Net Metering for Renewable Energy (First Amendment) Regulations, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a one-page draft amendment issued by the Delhi Electricity Regulatory Commission, dated 2 July 2024 (p1). It would insert new provisos into Regulation 5(3) of the DERC (Net Metering for Renewable Energy) Regulations, 2014 — called "the Principal Regulations" — and is styled the First Amendment to those regulations. It is expressly a draft: the text states only that it comes into force from the date of notification, and no notification date is printed (p1).
Section 1 gives the short title and commencement. Section 2 carries the substantive change, adding three provisos that turn on a 10 kW dividing line (p1). For renewable energy systems up to 10 kW, technical feasibility studies are waived; the distribution licensee must carry out any consequential enhancement of the consumer's sanctioned load; and the licensee must also carry out any upgradation of distribution infrastructure, including distribution transformer capacity, with that cost allowed as a pass-through in the Aggregate Revenue Requirement subject to the Commission's prudence check. For systems above 10 kW, the licensee must complete the technical feasibility study within fifteen days of receiving an application complete in all respects.
The amendment binds distribution licensees and affects net-metering consumers in Delhi, allocating responsibility for feasibility clearance, load enhancement and network upgradation between them and setting out the licensee's cost-recovery route (p1).
Read with this
The regulation
- Dated 2 Sep 2014Net Metering for Renewable Energy Regulations, 2014
Amendments and corrections
- Dated 26 Jul 2024Net Metering for Renewable Energy (First Amendment) Regulations, 2024
- Dated 2 Aug 2024Net Metering for Renewable Energy Regulations, 2014 — First Amendment, 2024
- Dated 1 May 2025Net Metering for Renewable Energy (First Amendment) Guidelines, 2025
- Dated 16 Jul 2026Net Metering for Renewable Energy (Second Amendment) Guidelines, 2026
Procedures and orders made under it
- Dated 31 May 2019Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2019
- Dated 24 Jun 2024Peer to Peer Energy Transaction Guidelines, 2024
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 26 May 2023Net Metering for Renewable Energy (First Amendment) Regulations, 2023 — Draft
- Dated 26 May 2023Public notice: Public Notice for Comments on Draft Net Metering for Renewable Energy (First Amendment) Regulations, 2023
- Dated 2 Jul 2024Public notice: Net Metering for Renewable Energy (First Amendment) Regulations, 2024 — consultation notice
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.