Skip to content

DERC · Delhi Electricity Regulatory Commission

Net Metering for Renewable Energy (First Amendment) Regulations, 2024 — Draft

Delhi Electricity Regulatory Commission (Net Metering for Renewable Energy) (First Amendment) Regulations, 2024

Draft amendmentDated 2 Jul 2024F.3(629)/Tariff-Engg./DERC/2020-21/6910 dated 2/07/2024

Draft

A proposal that has since been finalised as the Net Metering for Renewable Energy (First Amendment) Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a one-page draft amendment issued by the Delhi Electricity Regulatory Commission, dated 2 July 2024 (p1). It would insert new provisos into Regulation 5(3) of the DERC (Net Metering for Renewable Energy) Regulations, 2014 — called "the Principal Regulations" — and is styled the First Amendment to those regulations. It is expressly a draft: the text states only that it comes into force from the date of notification, and no notification date is printed (p1).

Section 1 gives the short title and commencement. Section 2 carries the substantive change, adding three provisos that turn on a 10 kW dividing line (p1). For renewable energy systems up to 10 kW, technical feasibility studies are waived; the distribution licensee must carry out any consequential enhancement of the consumer's sanctioned load; and the licensee must also carry out any upgradation of distribution infrastructure, including distribution transformer capacity, with that cost allowed as a pass-through in the Aggregate Revenue Requirement subject to the Commission's prudence check. For systems above 10 kW, the licensee must complete the technical feasibility study within fifteen days of receiving an application complete in all respects.

The amendment binds distribution licensees and affects net-metering consumers in Delhi, allocating responsibility for feasibility clearance, load enhancement and network upgradation between them and setting out the licensee's cost-recovery route (p1).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, New connections and load changes, ARR and true-up

Read with this

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document