MERC · Maharashtra Electricity Regulatory Commission

Renewable Purchase Obligation and REC Framework Regulations, 2019 — Second Amendment, 2026 — Draft

Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, its Compliance and Implementation of Renewable Energy Certificate Framework) (Second Amendment) Regulations, 2026

Draft amendmentReleased with the explanatory memorandum dated 22 Sep 2026No. MERC/Tech/Regulation/0133

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page draft amendment (p1–2) by which the Maharashtra Electricity Regulatory Commission proposes to amend its 2019 Renewable Purchase Obligation and REC Framework Regulations, already amended once in February 2024 and together called "the Principal Regulations".

The preamble (p1) recites the Commission's section 86(1)(e) function of promoting renewable generation, the 2019 notification and the 2024 amendment, and then anchors the change in a Government of Maharashtra notification dated 18 March 2026 that sets a 65% renewable procurement target by FY 2035-36 together with a minimum storage obligation for distribution licensees. The stated reason is regulatory certainty.

Clause 2 (p1) gives the regulations their title and makes them effective from publication in the Official Gazette. Clause 3.1 (p1–2) inserts a new Regulation 7.5(D) requiring every obligated entity to plan its power procurement so that by FY 2035-36 at least 65% of its total electricity procurement comes from renewable sources, with a proviso letting the Commission separately specify annual RPO targets for FY 2030-31 to FY 2035-36.

Clause 3.2 (p2) substitutes Regulation 7.7(b), replacing the storage-linked solar/wind obligation with a year-wise storage percentage schedule, measured on an energy basis, running from FY 2024-25 up to FY 2035-36. The schedule therefore reaches back to years before the amendment itself. The draft carries a blank date and an unsigned signature block (p2).

Standard name
RPO Regulations, REC Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Energy storage obligation

Read with this

Commencement notices and reasons

Earlier drafts

9 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft, 3 drafts or notices on a draft not held as English text, 1 amendment not held as English text and 1 commencement notice or statement of reasons not held as English text.

Voltaic last read MERC's website for final documents on 28 Nov 2026 (8 pages) and for drafts on 28 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document