Central Electricity Regulatory Commission (Regulation of Power Supply) (First Amendment) Regulations, 2020

Draft amendmentDated 16 Jul 2020No. L-1/42/2010-CERC dated 16.07.2020

Draft

A proposal that has since been finalised as the Regulation of Power Supply Regulations, 2010 — First Amendment, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's draft notification dated 16 July 2020 for the First Amendment to the CERC (Regulation of Power Supply) Regulations, 2010 (p1). It would commence on publication in the Official Gazette; the Gazette date is not printed (p1). Clause 2 rewrites the core definitions in Regulation 2: beneficiary, defaulting entity, default trigger date, a new due date, and outstanding dues; it deletes one definition and adds a clause treating the Central Transmission Utility as a transmission licensee where authorised for inter-State transmission billing, collection and disbursement (p1–3).

Clause 3 replaces the scope provision so the regulations apply to a generating station, transmission system and beneficiary only where an agreement or CERC regulations specifically provide for regulating supply on payment default or failure to maintain a letter of credit or other payment security mechanism (p3). Clause 4 makes a minor change to the notice provision in Regulation 4 (p3). Clause 5 requires the regulating entity to send the Regulation 4 notice to the RLDC/SLDC for an implementation plan, copy other despatch centres, RPCs and the defaulting entity, publish the notice in advance, and indemnify the despatch centres (p4). Clauses 6 and 7 change terminology in Regulations 6 and 8 (p4).

Clause 8 replaces Regulation 11 so the regulated entity must stick to the revised despatch schedule, with deviations governed by the DSM Regulations 2014 (p4–5). Clause 9 amends Regulation 12, and Clauses 10 and 11 replace the hydro-specific Regulations 14 and 18, allowing surplus power to be sold to avoid spillage and giving priority recovery of energy charges from sale proceeds, with the balance adjusted under Regulations 13 and 16 respectively (p5–6). The closing note records the principal regulations' Gazette publication on 30 September 2010 and corrigendum on 6 September 2011 (p6).

Primary topics
Payment security, Scheduling and despatch

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (2)

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document