CERC · Central Electricity Regulatory Commission
Regulation of Power Supply (First Amendment) Regulations, 2020 — Draft
Central Electricity Regulatory Commission (Regulation of Power Supply) (First Amendment) Regulations, 2020
Draft amendmentDated 16 Jul 2020No. L-1/42/2010-CERC dated 16.07.2020
Draft
A proposal that has since been finalised as the Regulation of Power Supply Regulations, 2010 — First Amendment, 2021.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's draft notification dated 16 July 2020 for the First Amendment to the CERC (Regulation of Power Supply) Regulations, 2010 (p1). It would commence on publication in the Official Gazette; the Gazette date is not printed (p1). Clause 2 rewrites the core definitions in Regulation 2: beneficiary, defaulting entity, default trigger date, a new due date, and outstanding dues; it deletes one definition and adds a clause treating the Central Transmission Utility as a transmission licensee where authorised for inter-State transmission billing, collection and disbursement (p1–3).
Clause 3 replaces the scope provision so the regulations apply to a generating station, transmission system and beneficiary only where an agreement or CERC regulations specifically provide for regulating supply on payment default or failure to maintain a letter of credit or other payment security mechanism (p3). Clause 4 makes a minor change to the notice provision in Regulation 4 (p3). Clause 5 requires the regulating entity to send the Regulation 4 notice to the RLDC/SLDC for an implementation plan, copy other despatch centres, RPCs and the defaulting entity, publish the notice in advance, and indemnify the despatch centres (p4). Clauses 6 and 7 change terminology in Regulations 6 and 8 (p4).
Clause 8 replaces Regulation 11 so the regulated entity must stick to the revised despatch schedule, with deviations governed by the DSM Regulations 2014 (p4–5). Clause 9 amends Regulation 12, and Clauses 10 and 11 replace the hydro-specific Regulations 14 and 18, allowing surplus power to be sold to avoid spillage and giving priority recovery of energy charges from sale proceeds, with the balance adjusted under Regulations 13 and 16 respectively (p5–6). The closing note records the principal regulations' Gazette publication on 30 September 2010 and corrigendum on 6 September 2011 (p6).
Read with this
The regulation
- Dated 28 Sep 2010Regulation of Power Supply Regulations, 2010
Amendments and corrections
- Dated 5 Sep 2011Regulation of Power Supply Regulations, 2010 — Corrigendum, 2011
- Dated 5 Sep 2011Regulation of Power Supply Regulations, 2010 — Corrigendum, 2011
- Dated 18 Feb 2021Regulation of Power Supply Regulations, 2010 — First Amendment, 2021
Commencement notices and reasons
Other copies of these documents (2)
- Dated 28 Sep 2010Regulation of Power Supply Regulations, 2010
- Dated 18 Feb 2021Regulation of Power Supply Regulations, 2010 — First Amendment, 2021
Earlier drafts
- Dated 16 Jul 2020Public notice: Draft Regulation of Power Supply (First Amendment) Regulations, 2020 — Public Notice
- Dated 16 Jul 2020Explanatory memorandum: Regulation of Power Supply (First Amendment) Regulations, 2020 — Explanatory Memorandum — Draft
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.