CERC · Central Electricity Regulatory Commission
Draft Regulation of Power Supply (First Amendment) Regulations, 2020 — Public Notice
Draft Central Electricity Regulatory Commission (Regulation of Power Supply) (First Amendment) Regulations, 2020.
Public notice on a draftDated 16 Jul 2020No. L-1/42/2010-CERC dated 16.07.2020
Draft
The draft has since been finalised as the Regulation of Power Supply Regulations, 2010 — First Amendment, 2021.
Public notice on the Regulation of Power Supply (First Amendment) Regulations, 2020 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a one-page public notice from the Secretary, CERC, announcing that the Commission has prepared a draft First Amendment to its Regulation of Power Supply Regulations and has posted the draft on the Commission's website (p1). It is a consultation-stage document, not the amendment itself: the operative regulation is only referred to, not reproduced.
Issued under s.178 of the Electricity Act 2003 and the Electricity (Procedure for Previous Publication) Rules, 2005, the notice invites comments, suggestions and objections from stakeholders and interested persons on the draft (p1). Submissions may be sent by email to the Secretary or uploaded by registered users through the SAUDAMINI portal's e-Regulation link, with a helpdesk number given for technical queries (p1). The closing date is 16 August 2020 (p1).
The date and venue of the public hearing will be intimated separately (p1). For an analyst, the document's value is procedural and calendrical — it fixes who may comment, how and by when — rather than substantive.
Read with this
The regulation
- Dated 28 Sep 2010Regulation of Power Supply Regulations, 2010
Amendments and corrections
- Dated 5 Sep 2011Regulation of Power Supply Regulations, 2010 — Corrigendum, 2011
- Dated 5 Sep 2011Regulation of Power Supply Regulations, 2010 — Corrigendum, 2011
- Dated 18 Feb 2021Regulation of Power Supply Regulations, 2010 — First Amendment, 2021
Commencement notices and reasons
Other copies of these documents (2)
- Dated 28 Sep 2010Regulation of Power Supply Regulations, 2010
- Dated 18 Feb 2021Regulation of Power Supply Regulations, 2010 — First Amendment, 2021
Earlier drafts
- Dated 16 Jul 2020Regulation of Power Supply (First Amendment) Regulations, 2020 — Draft
- Dated 16 Jul 2020Explanatory memorandum: Regulation of Power Supply (First Amendment) Regulations, 2020 — Explanatory Memorandum — Draft
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.