CERC · Central Electricity Regulatory Commission
Regulation of Power Supply Regulations, 2010 — Corrigendum, 2011
Corrigendum of Regulation of Power Supply Regulations, 2010 - Gazette
CorrigendumDated 5 Sep 2011Published in the Gazette 6 Sep 2011No. L-1/42/2010-CERC dated the 5th September, 2011
Replaced by Repeal of Regulation of Power Supply Regulations, 2010 and Regulation of Power Supply Regulations, 2010 — Repeal Notification, 2021
See those regulations for the date they took effect and for anything they keep in force.
Corrects the Regulation of Power Supply Regulations, 2010 or one of its amendments.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal, Implementation Plan, if any, already under implementation by Regional Load Despatch Centres or State Load Despatch Centres as on the date of this notification, shall run its normal course under the repealed regulations.”
Summary
Summary written by software. Check the regulator's original before you rely on it.
A one-page Gazette corrigendum issued by the Central Electricity Regulatory Commission on 5 September 2011 and carried in the Gazette of India (Extraordinary, Part III—Section 4, No. 185) of 6 September 2011 (p1). It orders two corrections to the CERC (Regulation of Power Supply) Regulations, 2010, each identified by page, regulation and line of the principal text: at page 12, first line of Regulation 4, the word "casein" is to be read as "In"; and at page 14, third line of Regulation 6, "Dafaulting Entity" is to be read as "Regulating Entity" (p1). The second goes beyond a misprint — it changes the name of an entity used in the principal regulations. A foot-note records that the principal regulations were published on 30 September 2010 in Part III, Section 4 of Gazette of India No. 248 (p1). The corrigendum states no commencement, savings or transitional provision.
Read with this
The regulation
- Dated 28 Sep 2010Regulation of Power Supply Regulations, 2010
Amendments and corrections
- Dated 5 Sep 2011Regulation of Power Supply Regulations, 2010 — Corrigendum, 2011
- Dated 18 Feb 2021Regulation of Power Supply Regulations, 2010 — First Amendment, 2021
Commencement notices and reasons
Other copies of these documents (2)
- Dated 28 Sep 2010Regulation of Power Supply Regulations, 2010
- Dated 18 Feb 2021Regulation of Power Supply Regulations, 2010 — First Amendment, 2021
Earlier drafts
- Dated 16 Jul 2020Regulation of Power Supply (First Amendment) Regulations, 2020 — Draft
- Dated 16 Jul 2020Public notice: Draft Regulation of Power Supply (First Amendment) Regulations, 2020 — Public Notice
- Dated 16 Jul 2020Explanatory memorandum: Regulation of Power Supply (First Amendment) Regulations, 2020 — Explanatory Memorandum — Draft
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.