CERC · Central Electricity Regulatory Commission
Regulation of Power Supply Regulations, 2010 — First Amendment, 2021
Central Electricity Regulatory Commission (Regulation of Power Supply) (First Amendment) Regulations, 2021
AmendmentDated 18 Feb 2021No. L-1/42/2010-CERC dated 18th February, 2021
Replaced by Repeal of Regulation of Power Supply Regulations, 2010 and Regulation of Power Supply Regulations, 2010 — Repeal Notification, 2021
See those regulations for the date they took effect and for anything they keep in force.
Amends the Regulation of Power Supply Regulations, 2010.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal, Implementation Plan, if any, already under implementation by Regional Load Despatch Centres or State Load Despatch Centres as on the date of this notification, shall run its normal course under the repealed regulations.”
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a CERC amendment regulation, dated 18 February 2021, that rewrites substantial parts of the Central Electricity Regulatory Commission (Regulation of Power Supply) Regulations, 2010 — the framework under which power supply to a payment-defaulting beneficiary can be regulated (p1).
Much of the instrument is definitional and scope work. It recasts "Beneficiary" to cover central-station allottees, buyers under tariffs determined or adopted by the Commission, long/medium-term open access holders and ISTS users; restates "Defaulting entity"; and introduces defined "Default Trigger Date" and "Due date" concepts that borrow due-date rules from the Sharing Regulations, 2020, the Tariff Regulations, 2019 and individual agreements (p1–3). It adds that references to "transmission licensee" include the Central Transmission Utility authorised to bill, collect and disburse ISTS charges (p3). It also deletes one definition and narrows applicability so the regulations bite only where an agreement or another CERC regulation specifically provides for regulation of power supply (p3).
Procedure is tightened: the Regulating Entity must copy its notice to the RLDC/SLDC, serve other load despatch centres, RPCs and the defaulting entity, post it on its website at least three days before regulation begins, and indemnify the load despatch centres (p4). Later clauses swap terminology, fix an internal cross-reference, extend Regulation 4 to "applicable Regulations", and add a new Regulation 11A routing denial of short-term open access for payment default to the 2008 Open Access Regulations (p4–5).
Two substituted regulations deal with hydro stations, permitting sale of power rendered surplus to avoid spillage during regulation, with spillage energy charges recovered first from those sale proceeds (p6). The amendment takes effect from Gazette publication, but the Gazette date is not printed (p1); a closing note records the 2010 principal regulations and their 2011 corrigendum (p6).
Read with this
The regulation
- Dated 28 Sep 2010Regulation of Power Supply Regulations, 2010
Amendments and corrections
- Dated 5 Sep 2011Regulation of Power Supply Regulations, 2010 — Corrigendum, 2011
- Dated 5 Sep 2011Regulation of Power Supply Regulations, 2010 — Corrigendum, 2011
Commencement notices and reasons
Other copies of these documents (2)
- Dated 28 Sep 2010Regulation of Power Supply Regulations, 2010
- Dated 18 Feb 2021Regulation of Power Supply Regulations, 2010 — First Amendment, 2021
Earlier drafts
- Dated 16 Jul 2020Regulation of Power Supply (First Amendment) Regulations, 2020 — Draft
- Dated 16 Jul 2020Public notice: Draft Regulation of Power Supply (First Amendment) Regulations, 2020 — Public Notice
- Dated 16 Jul 2020Explanatory memorandum: Regulation of Power Supply (First Amendment) Regulations, 2020 — Explanatory Memorandum — Draft
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.