Skip to content

CERC · Central Electricity Regulatory Commission

Regulation of Power Supply Regulations, 2010 — Corrigendum, 2011

Corrigendum of Regulation of Power Supply Regulations, 2010

CorrigendumDated 5 Sep 2011No. L-1/42/2010-CERC dated 5th September 2011

Replaced by Repeal of Regulation of Power Supply Regulations, 2010 and Regulation of Power Supply Regulations, 2010 — Repeal Notification, 2021

See those regulations for the date they took effect and for anything they keep in force.

Corrects the Regulation of Power Supply Regulations, 2010 or one of its amendments.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, Implementation Plan, if any, already under implementation by Regional Load Despatch Centres or State Load Despatch Centres as on the date of this notification, shall run its normal course under the repealed regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A one-page corrigendum issued by CERC on 5 September 2011 (p1) making two textual corrections to the Central Electricity Regulatory Commission (Regulation of Power Supply) Regulations, 2010. Both corrections are limited to specific words on specific pages of the principal regulations: a word in the first line of Regulation 4 on page 12 is replaced, and a term in the third line of Regulation 6 on page 14 is replaced — the latter swapping "Defaulting Entity" for "Regulating Entity" (p1). No other provision is touched. A closing note records that the principal regulations were published on 30 September 2010 in Part III-Section 4 of Gazette of India No. 248 (p1). The corrigendum itself states no commencement date, so its effect runs from its issue or from whatever date the principal regulations fix. It matters only to readers relying on the corrected text of the 2010 regulations.

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (2)

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document