CERC · Central Electricity Regulatory Commission
Regulation of Power Supply (First Amendment) Regulations, 2020 — Explanatory Memorandum — Draft
Draft Central Electricity Regulatory Commission (Regulation of Power Supply) (First Amendment) Regulations, 2020
Explanatory memorandum to a draftDated 16 Jul 2020L-1/42/2010-CERC dated 16.07.2020
Draft
The draft has since been finalised as the Regulation of Power Supply Regulations, 2010 — First Amendment, 2021.
Explanatory memorandum to the Regulation of Power Supply (First Amendment) Regulations, 2020 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Commission proposes a first amendment to the CERC (Regulation of Power Supply) Regulations, 2010 and explains why in this explanatory memorandum (p1). The driver is alignment: the 2010 Regulations measure default and outstanding dues against a 60-day payment window, while the CERC (Terms and Conditions of Tariff) Regulations, 2019 (control period 2019-2024) and the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2020 both use 45 days from presentation of bills (p1–2).
Paragraphs 3–6 recite the existing definitions of "Default Trigger Date" and "Outstanding dues" and propose to recast both around a new defined "Due date", inserted as Regulation 2(1)(e-i). The definitions of "Beneficiary" and "Defaulting entity" are to be modified, and the definition of "User" deleted (p2–3).
Paragraphs 7–8 explain that the 2020 Sharing Regulations authorise the CTU to bill, collect and disburse transmission charges and to invoke regulation of power supply under the 2010 Regulations. A new clause (1A) would extend references to "transmission licensee" to include the CTU (p3).
Paragraphs 9–10 propose amending Regulation 3 so that regulation of power can be invoked where a provision exists either in the agreement between generator/transmission licensee and beneficiary or in the applicable CERC regulations, and adding "or applicable Regulations" after "Agreement" in Regulation 4 (p3–4).
Paragraphs 11–15 propose clarifying Regulation 5 (service of notice and request for an implementation plan), correcting the status of the entity in Regulations 6 and 12(1), substituting "withdrawal or postponement" for "cancellation" in Regulation 8, replacing references to the repealed Unscheduled Interchange Regulations, 2009 with the Deviation Settlement Mechanism Regulations, 2014 in Regulations 11(1), 14 and 18, and deleting Regulation 12(2) (p4).
Read with this
The regulation
- Dated 28 Sep 2010Regulation of Power Supply Regulations, 2010
Amendments and corrections
- Dated 5 Sep 2011Regulation of Power Supply Regulations, 2010 — Corrigendum, 2011
- Dated 5 Sep 2011Regulation of Power Supply Regulations, 2010 — Corrigendum, 2011
- Dated 18 Feb 2021Regulation of Power Supply Regulations, 2010 — First Amendment, 2021
Commencement notices and reasons
Other copies of these documents (2)
- Dated 28 Sep 2010Regulation of Power Supply Regulations, 2010
- Dated 18 Feb 2021Regulation of Power Supply Regulations, 2010 — First Amendment, 2021
Earlier drafts
- Dated 16 Jul 2020Regulation of Power Supply (First Amendment) Regulations, 2020 — Draft
- Dated 16 Jul 2020Public notice: Draft Regulation of Power Supply (First Amendment) Regulations, 2020 — Public Notice
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.