CERC · Central Electricity Regulatory Commission

Regulation of Power Supply Regulations, 2010

Central Electricity Regulatory Commission (Regulation of Power Supply) Regulations, 2010

Regulation · Gazette copyDated 28 Sep 2010Published in the Gazette 30 Sep 2010No. L-1/42/2010-CERC. dated 28th September, 2010

Replaced by Repeal of Regulation of Power Supply Regulations, 2010 and Regulation of Power Supply Regulations, 2010 — Repeal Notification, 2021

See those regulations for the date they took effect and for anything they keep in force.

The Gazette copy of the Regulation of Power Supply Regulations, 2010.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, Implementation Plan, if any, already under implementation by Regional Load Despatch Centres or State Load Despatch Centres as on the date of this notification, shall run its normal course under the repealed regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Central Electricity Regulatory Commission (Regulation of Power Supply) Regulations, 2010, notified on 28 September 2010 and published in the Gazette of India, Extraordinary, dated 30 September 2010 (p1, p9), give generating companies and transmission licensees a contractual self-help route against beneficiaries that do not pay or do not maintain the agreed payment security. They bite only where the underlying Agreement itself contains a provision for regulating power supply (p11).

Chapter I (p9–11) gives the short title and commencement — in force from the date of publication in the Official Gazette — and defines the actors: the defaulting entity, the default trigger date (with two Explanations fixing it by reference to bill service and to lapse of the letter of credit or other security), outstanding dues, the regulating entity that triggers action, the regulated entity whose supply is curtailed, the beneficiary, and the ISTS user connected at 33 kV and above.

Chapter II (p12–16) lays down the procedural chain: a notice stating dues, quantum and duration of reduction in drawl schedule or of denial of medium-term/long-term access; service on the defaulting entity, the SLDC/RLDC and the Regional Power Committee with at least three days' advance website posting; an implementation plan from the Load Despatch Centre within three days; progressive increase in the reduction; implementation from the fourth day of notice; withdrawal once dues are recovered; concurrent regulation where both a generator and a transmission licensee are owed money; and an overriding grid-security discretion for the Load Despatch Centre.

Chapters III and IV (p16–19) handle the two regulating entities separately — sale of power rendered surplus, the sequence in which sale proceeds are adjusted against dues, who bears capacity charges, sharing between a generator and a transmission licensee, and hydro-specific provisions allowing UI injection to avoid spillage. Chapter V (p19) is a power to remove difficulty.

Primary topics
Payment security, Open access, Scheduling and despatch

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (1)

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.