CERC · Central Electricity Regulatory Commission
Regulation of Power Supply Regulations, 2010
Central Electricity Regulatory Commission (Regulation of Power Supply) Regulations, 2010
Regulation · Gazette copyDated 28 Sep 2010Published in the Gazette 30 Sep 2010No. L-1/42/2010-CERC. dated 28th September, 2010
Replaced by Repeal of Regulation of Power Supply Regulations, 2010 and Regulation of Power Supply Regulations, 2010 — Repeal Notification, 2021
See those regulations for the date they took effect and for anything they keep in force.
The Gazette copy of the Regulation of Power Supply Regulations, 2010.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal, Implementation Plan, if any, already under implementation by Regional Load Despatch Centres or State Load Despatch Centres as on the date of this notification, shall run its normal course under the repealed regulations.”
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Central Electricity Regulatory Commission (Regulation of Power Supply) Regulations, 2010, notified on 28 September 2010 and published in the Gazette of India, Extraordinary, dated 30 September 2010 (p1, p9), give generating companies and transmission licensees a contractual self-help route against beneficiaries that do not pay or do not maintain the agreed payment security. They bite only where the underlying Agreement itself contains a provision for regulating power supply (p11).
Chapter I (p9–11) gives the short title and commencement — in force from the date of publication in the Official Gazette — and defines the actors: the defaulting entity, the default trigger date (with two Explanations fixing it by reference to bill service and to lapse of the letter of credit or other security), outstanding dues, the regulating entity that triggers action, the regulated entity whose supply is curtailed, the beneficiary, and the ISTS user connected at 33 kV and above.
Chapter II (p12–16) lays down the procedural chain: a notice stating dues, quantum and duration of reduction in drawl schedule or of denial of medium-term/long-term access; service on the defaulting entity, the SLDC/RLDC and the Regional Power Committee with at least three days' advance website posting; an implementation plan from the Load Despatch Centre within three days; progressive increase in the reduction; implementation from the fourth day of notice; withdrawal once dues are recovered; concurrent regulation where both a generator and a transmission licensee are owed money; and an overriding grid-security discretion for the Load Despatch Centre.
Chapters III and IV (p16–19) handle the two regulating entities separately — sale of power rendered surplus, the sequence in which sale proceeds are adjusted against dues, who bears capacity charges, sharing between a generator and a transmission licensee, and hydro-specific provisions allowing UI injection to avoid spillage. Chapter V (p19) is a power to remove difficulty.
Read with this
The regulation
- Dated 28 Sep 2010Regulation of Power Supply Regulations, 2010
Amendments and corrections
- Dated 5 Sep 2011Regulation of Power Supply Regulations, 2010 — Corrigendum, 2011
- Dated 5 Sep 2011Regulation of Power Supply Regulations, 2010 — Corrigendum, 2011
- Dated 18 Feb 2021Regulation of Power Supply Regulations, 2010 — First Amendment, 2021
Commencement notices and reasons
Other copies of these documents (1)
- Dated 18 Feb 2021Regulation of Power Supply Regulations, 2010 — First Amendment, 2021
Earlier drafts
- Dated 16 Jul 2020Regulation of Power Supply (First Amendment) Regulations, 2020 — Draft
- Dated 16 Jul 2020Public notice: Draft Regulation of Power Supply (First Amendment) Regulations, 2020 — Public Notice
- Dated 16 Jul 2020Explanatory memorandum: Regulation of Power Supply (First Amendment) Regulations, 2020 — Explanatory Memorandum — Draft
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.