Connectivity and GNA to the inter-State Transmission System Regulations, 2022 — Third Amendment, 2025
Amends the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022
- Modalities of Solar Hour Access and Non-Solar Hour Access › (1) Grant of Connectivity with non-solar hour access to an …… from the Grid throughout the day for the purpose of charging power for storage, for quantum as applied for and permitted by the Nodal Agency vide the grant of Connectivity to such entity, in terms of these regulations, subject to …
- 54. Amendment to Regulation 37.2 of the Principal … › 55. New Regulation 37.10Entity shall specify the maximum drawal required from the grid for such additional capacity (for the purpose of charging power for storage), within the quantum of Connectivity, which shall be processed by the Nodal Agency based on …
3 matching passages in this document
Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022
4 amendments on Voltaic
- 2. Definition › (ab) "Nodal Agency" means… (ii) the agency designated for T-GNA for bilateral transactions which shall be RLDC of the region where point of drawal is located, for the purpose of Regulations 26 to 36 of these regulations; …
- 34. Transmission charges for T-GNATransmission charges for T-GNA, in case of bilateral and collective transactions, shall be payable only at point of drawal, as per the last published Transmission charge rate for T-GNA for the State where such point of drawal is located: …
3 matching passages in this document
Indian Electricity Grid Code Regulations, 2023
1 amendment on Voltaic
- 49. PROCEDURE FOR SCHEDULING AND DESPATCH FOR INTER-STATE … › (3) Power to revise schedulesSwitching on/off pump storage plants operating in pumping mode; (iv) Despatching emergency demand response measures; (v) Direct the SLDCs or other regional entities to increase or decrease their drawal or injection by revising their …
- 45. GENERAL PROVISIONS › (12) Minimum turndown level for regional entity thermal …… or ESS or a drawee entity shall be allowed to schedule injection or drawal only up to its effective GNA quantum and T-GNA quantum, as applicable, in accordance with the GNA Regulations. …
3 matching passages in this document
Connectivity and General Network Access to the inter-State Transmission System (First Amendment) Regulations, 2023
Amends the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022
- 22.2. The number "24" shall be substituted with number "18" … › 23. New Regulation 26.4, Regulation 26.5 and Regulation 26.6… or (b) it may convert full T-GNARE into T-GNA by making an application to the Nodal Agency. 26.5 The entities covered under Regulation 26.4 of these regulations may apply for additional GNARE or T-GNARE, in case their drawal requirement …
- 14.1. A new Regulation, namely, Regulation 18.3 shall be … › 16.1. New Regulations 20.4, 20.5 and 20.6 shall be added …20.5 The entities covered under Regulation 20.4 of these regulations may apply for additional GNARE or T-GNARE, in case their drawal requirement is more than quantum of GNARE. …
3 matching passages in this document
Karnataka Electricity Grid Code (KEGC), 2025
- 7.9. Procedure for Scheduling and Despatch Timelines for …… and the drawal schedule of the buyer. r. Requisition of schedule by STOA /T-GNA grantees: (i) Based on the entitlement or otherwise, intra-State entities which are STOA/T-GNA grantees, shall furnish time block-wise requisition for …
- 2. Issuance of day-ahead schedule… intra state entities including the information received from RLDC for the GNA grantees and T-GNA grantees: (i) The ex-power plant schedule to each of the regional entity generating station and In-SGS, …
3 matching passages in this document
Fees and Charges of Regional Load Despatch Centre and other related matters Regulations, 2024
- CHAPTER-2 GENERAL › 8. UsersThe captive generating plant and Standalone storage system shall be considered as a user for the purpose of these regulations; (c) In the case of inter-State transmission licensees, …
- CHAPTER-10 BILLING AND OTHER MISCELLANEOUS PROVISIONS › 33. Regulation of access to defaulting entitiesT-GNA, including already approved T-GNA, for the sale and purchase of electricity through short term contracts, including in the power exchange, shall be regulated entirely: Central Electricity Regulatory Commission (Fees and Charges of …
3 matching passages in this document
Terms and Conditions of Tariff Regulations, 2024
2 amendments on Voltaic
- CHAPTER 1 PRELIMINARY… 'Schedule Drawal' for a time block or any period means the schedule of drawal in MW or MWh ex-bus, including the schedule for Ancillary Services given by the concerned Load Despatch Centre; …
- CHAPTER 1 PRELIMINARY… Transmission System) Regulations, 2022 (excluding those granted "T-GNA");
3 matching passages in this document