Skip to content

CERC · Central Electricity Regulatory Commission

Indian Electricity Grid Code Regulations, 2023

Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2023

RegulationDated 29 May 2023No. L-1/265/2022/CERC dated 29.5.2023

1 amendment to it is on Voltaic, dated 23 Oct 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 59 of 212. Check the regulator's original before you rely on it.

The document is the CERC's principal Indian Electricity Grid Code Regulations, 2023, issued as Notification No. L-1/265/2022/CERC dated 29.5.2023 (p1). It is made under s.79(1)(h) read with s.178(2)(g) of the Electricity Act, 2003 and applies across India to all grid users and institutions — SLDCs, REMCs, RLDCs, NLDC, CTU, STUs, licensees, RPCs, Settlement Nodal Agencies, QCAs and power exchanges — with DVC treated as a separate regional control area and BBMB/SSP stations as regional entities (p4–5). Commencement is deferred: it takes effect from a date the Commission may notify, and different dates may be appointed for different regulations (p4).

Chapter 1 (pp4–25) sets the short title, scope and a large table of definitions. Chapter 2 (pp26–30) is the Resource Planning Code: it requires distribution licensees to forecast demand, STUs to aggregate state demand, licensees to assess generation resource adequacy and prepare procurement plans, NLDC to run national simulations, and CTU/STU to plan transmission resource adequacy. Chapter 3 (pp31–35) is the Connection Code: connectivity via CTU under the GNA Regulations, compliance with listed CEA/CERC standards, connection procedure, connectivity agreements, technical studies and communication facilities.

Chapter 4 (pp36–42) is the Protection Code: uniform protection protocol, RPC-led protection settings review, protection audit (internal annual and third-party five-yearly for 220 kV and above; 132 kV and above in NER), recording instruments and system protection schemes. Chapter 5 (pp43–59) is the Commissioning and Commercial Operation Code: start-up power/infirm power drawal and injection, trial run notices, trial run requirements for thermal, hydro, wind/solar/ESS/hybrid and transmission systems, pre-COD documents and tests, RLDC trial-run certificate, and generating company/transmission licensee declarations.

Standard name
Grid Code
Primary topics
Grid operation and grid code, Resource adequacy, Connectivity and GNA

Read with this

Amendments and corrections

Commencement notices and reasons

Other copies of these documents (2)

Earlier drafts

6 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text and 2 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document