Skip to content

CERC · Central Electricity Regulatory Commission

Connectivity and General Network Access to the inter-State Transmission System (First Amendment) Regulations, 2023

Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (First Amendment) Regulations, 2023

AmendmentDated 1 Apr 2023No. L-1/261/2021/CERC

Amends the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's First Amendment to its Connectivity and General Network Access (GNA) Regulations, 2022, issued on 1 April 2023 (p1). It is a package of roughly thirty-three amending clauses that create a parallel network-access regime for renewable energy and tighten the conditions attached to connectivity grantees.

The amendment first adds three definitions: GNARE (GNA for drawal exclusively from renewable sources), its temporary counterpart T-GNARE, and 'Host State' (p1–2). Clauses 15–16 and 23 then build the machinery around them — new Regulations 20.4–20.6 (p9–10) and 26.4–26.6 (p14–15) set who may apply, make GNARE and GNA mutually exclusive, and provide for conversion or re-scheduling at transmission deviation rates.

A second theme is eligibility and security for connectivity. Regulation 5.2 is substituted to let a generating station or energy storage system add capacity inside its granted connectivity with CTU approval, under a lead-generator responsibility (p2–3). Regulation 5.8 is expanded with documents required from renewable power park developers and from renewable generating stations/ESS, including a bank guarantee route in lieu of land rights (p3–4). New Regulations 11A and 11B impose post-grant conditions — land documents, an auditor's certificate on equity release, financial closure — and prescribe revocation and encashment of connectivity bank guarantees on failure (p5–7).

The remainder covers bulk-consumer GNA sharing with subsidiaries at the same connection point (p7); returns of Conn-BG1/2/3 (p8, p16–17); a new head of GNA for intra-State-connected injecting entities and deemed GNA for holders of Long Term Access granted under the 2009 Connectivity Regulations (p8–9); a host-State GNA reduction mechanism tied to a new Annexure-II (p9, p20–22); a new revocation-of-connectivity provision (p12–13); a revised relinquishment regime (p13–14); settlement of intra-State transmission charges for T-GNA by power exchanges with SLDCs (p16); Medium Term Open Access treatment and deemed GNA for trading licensees (p17–18); and directions to the Nodal Agency to revise formats and the Detailed Procedure (p18). Annexure-I's West Bengal row is substituted and its Total row deleted (p19).

Importantly, clause 1.2 states the regulations take effect only on a date CERC notifies, not on the issue date (p1).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Open access, Transmission tariff

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document