Connectivity and GNA to the inter-State Transmission System Regulations, 2022 — Third Amendment, 2025

Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (Third Amendment) Regulations, 2025

AmendmentDated 31 Aug 2025No. L-1/261/2021/CERC dated 31.08.2025

Amends the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 30 of 49. Check the regulator's original before you rely on it.

This is the Third Amendment to CERC's Connectivity and General Network Access (GNA) Regulations, 2022, issued as Notification No. L-1/261/2021/CERC dated 31.08.2025 (p1). It is a clause-by-clause amending instrument rather than a fresh code: each numbered paragraph rewrites, inserts or deletes a specific regulation of the Principal Regulations. It comes into force from the date of publication in the official Gazette (p1) — no Gazette date is printed.

The opening sections extend the Principal Regulations' vocabulary to a new solar-hour / non-solar-hour access paradigm, adding definitions of Cluster of ISTS substations, Connectivity Grantee, Host RLDC, solar hours, solar hour access, non-solar hours and non-solar hour access (p1–2). A substitution of Regulation 3.7, with new Regulations 3.8 and 3.9, sets out how withdrawal of a Connectivity or GNA application is handled at each stage — before in-principle grant, after in-principle but before final grant, and after final grant but before the Connectivity Agreement is signed — and how the application fee, land documents and the connectivity bank guarantees (Conn-BG1, Conn-BG2, Conn-BG3) are forfeited, encashed or returned, with an online-payment alternative to encashment (p2–5).

Sections 4–13 change eligibility and application rules: minimum quantum for the lead-generator route (p5); a new route for REGS and ESS connecting to the BBMB network now that it is declared ISTS, split by size band and with a lighter compliance set for the smallest band (p5–6); non-solar-hour access for wind or ESS and solar-hour access for solar or renewable hybrid stations (p6–7); the ability to add capacity within an already granted connectivity quantum (new Regulation 5.2, p7–9); storage-specific rules on declaring maximum injection and drawal (5.2A, 5.4, p9); phased application by Renewable Power Park Developers above 500 MW (p9); shared terminal bays and switchyards (5.6, p10); revised documentation under 5.8(xi), including an LOA/PPA-based route for renewable generators (p10–12); land-requirement and project-cost norms published by CTU plus a one-time land-parcel change mechanism (5.9–5.10, p12–13); and Regulation 5.11, which defines solar-hour and non-solar-hour access and works through several illustrative conversion examples, including the floor below which conversion is not offered (p13–15).

Sections 14–29 govern the grant process: closure of applications where augmentation is not approved (6.3, p15); deletion of a proviso to 7.2 (p15); revised guarantee amounts, issuers and formats (8.2–8.5, p15–16); contents of the final-grant intimation (9.1, p16–17); a new change-of-source route with a once-only limit (9.3, p17–18); the Connectivity Agreement Cat-1/Cat-2 architecture and deadlines for firm start dates, coordinates and single-line diagrams (10.1, 10.4–10.8, 10.11, p18–20); monitoring of compliance and of connectivity utilisation by the Nodal Agency and RLDCs (11.3A, 11.3B, p21); a large rewrite of Regulation 11A covering land documents, financial closure, conversion between the LOA/PPA route and the land/other-document routes, re-conversion on payment of a fee, execution through group companies, and change-of-control restrictions (p21–26); and new Regulation 11C permitting terminal-bay capacity that falls vacant to be reallocated to another entity within the same Cluster of ISTS substations (p26–27).

Sections 30–39 continue with dedicated-line construction, group-company use of connectivity and GNA, transfer of connectivity to the implementing entity on COD, treatment of encashed guarantees in monthly transmission charges, GNA eligibility for intra-State-connected injecting entities and ESS, GNA at shared bays, and STU bulk applications for additional GNA (p27–30). Several detailed procedures and annexures are left to CTU, NLDC, RLDCs and the Nodal Agency.

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Energy storage deployment, Open access charges

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document