Meghalaya State Grid Code Regulations, 2026
- 10.6. FOR OPTIMUM UTILIZATION OF HYDRO ENERGY › 10.7. SCHEDULING OF WS SELLER AND ESS BY QCA… to coordinate and facilitate scheduling for such generating stations or energy storage system(s). Provided that the roles, technical obligations, and forecasting or scheduling activities of the QCA shall be discharged as per the …
- 8.5. CONTROL HIERARCHY › 8.6. Primary Control… seconds for Intra state entity Generating Stations and energy storage systems. Higher resolution data from GT terminal shall be furnished by Generators to SLDC, which shall be verified by SLDC and same will be furnished to RLDC. 8.6.14. …
3 matching passages in this document
Renewable Energy Purchase Obligation & its Compliance (3rd Amendment) Regulations, 2018
Amends the Renewable Energy Purchase Obligation & its Compliance Regulations, 2018
- MEGHALAYA STATE ELECTRICITY REGULATORY COMMISSION SHILLONG › 2. Amendment to Regulation 5 of the Principal Regulation… Provided that the other renewable energy component may be met by energy produced from any renewable energy power project other than specified in Note i, ii and iii above and shall comprise energy from all WPPs and Hydro Power Projects …
- MEGHALAYA STATE ELECTRICITY REGULATORY COMMISSION SHILLONG › 2. Amendment to Regulation 5 of the Principal Regulation… Provided that the hydro renewable energy component shall be met only by energy produced from Hydro Power Projects [including Pump Storage Projects (PSPs) and Small Hydro Projects (SHPs)], commissioned after 31st March, 2024: …
3 matching passages in this document
Terms and Conditions of Green Energy Open Access Regulations, 2023
- 3. Definitions… liquid fuel or combination of these as its primary source of energy, which are used in Thermal Generating Station for generating electricity; (j) "Green Energy" means the electrical energy from renewable sources of energy including hydro …
- 9. Green Energy CertificateGreen Energy Certificate The Nodal agency, as the case may be, shall give Green Energy certificate on yearly basis to the consumers for the green energy supplied by the licensee to consumer on his request beyond the renewable purchase …
3 matching passages in this document
Multi Year Tariff (5 of 2026) Regulations, 2026
- 1.2.2. "Act" means the Electricity Act, 2003 (36 of 2003), …… 1.2.67."Pumped Storage Hydro Generating Station" means a hydro generating station which generates power through energy stored in the form of water energy, pumped from a lower elevation reservoir to a higher elevation reservoir; …
- ECR = SHR x LPPF x 100 / {CVPF x (100 AUX) }… AUX =Normative auxiliary energy consumption in percentage. CVPF = (a) Weighted Average Gross calorific value of coal considering GCV as per Regulation 60, in kCal per kg for coal based stations less 85 Kcal/Kg on account of variation …
3 matching passages in this document
Meghalaya Framework for Resource Adequacy Regulations, 2023
- Demand Assessment and Forecasting › 6. Long-term and Medium-term Demand Forecast… distributive energy resources, storage, and policies, which can impact econometric parameters, impact of national hydrogen mission. For each policy, a separate trajectory should be developed for each customer category. 6.9. …
- Preliminary › 4. Definitions… storage systems for energy shift, and demand response measures for managing the intermittency and variability of renewable energy sources. m. "Short term" means five years for development of demand forecast, generation resource plan, and …
3 matching passages in this document
Meghalaya Multi Year Tariff (5 of 2026) Regulations, 2026 — Statement of Reasons
- 2.6.1. Proposed Provision in Draft MSERC (Multi Year … › 2.6.3. Analysis and Decision… to receive power from a generating station and liable to pay capacity and energy charges under a Power Purchase Agreement (PPA). Linking it specifically to distribution licensees ensures regulatory certainty, as they are the primary …
- 2.17.1. Proposed Provision in Draft MSERC (Multi Year … › 2.17.3. Analysis and Decision… and Energy Storage System (ESS) Developers who are subject to tariff regulation under the Electricity Act, 2003 and these Regulations. 2.17.3.2. This formulation is consistent with the practices of the State Commissions such as HPERC and …
3 matching passages in this document
Power Purchase and Procurement Regulations, 2012
- 10. Criteria for power purchase… generation from non-conventional energy sources like wind, solar etc but for which generation may waste; or generation from storage type hydro plant but for which generation may result in spillage of water (2) The licensee shall endeavor …
- 10. Criteria for power purchase › (C) Short term power procurement Plan… forecast for the plan period of energy and capacity availability from each of the existing sources of power (d) plans for reducing the demand for power in the forecast period through demand side management measures (e) …
3 matching passages in this document
Draft Green Energy Open Access Regulations, 2023 — Discussion Paper
Draft· finalised as Terms and Conditions of Green Energy Open Access Regulations, 2023- PRELIMINARY › 3. Definitions… liquid fuel or combination of these as its primary source of energy, which are used in Thermal Generating Station for generating electricity; (i) "Green Energy" means the electrical energy from renewable sources of energy including hydro …
- Where, › 14. Cross subsidy surcharge… Cross subsidy surcharge a) If Green energy open access facility is availed by consumer of a distribution licensee of the State, then such consumer, in addition to transmission and wheeling charges, shall pay cross subsidy surcharge …
3 matching passages in this document
Terms and Conditions of Green Energy Open Access Regulations, 2023
Draft· finalised as Terms and Conditions of Green Energy Open Access Regulations, 2023