Search the library
Filters
Topic
DistributionGeneral / AdministrativeRenewable EnergyTariff & PricingGrid OperationsOpen AccessLicensing & ComplianceTransmissionYear
5 documents match “energy storage obligation”.
Tamil Nadu Electricity Grid Code, 2025 — Draft
Draft- (a) Inertia › Provided that… second for generating stations and energy storage systems and ten (10) seconds for the State control area. (xv) The SRLDC shall calculate actual frequency response characteristics of all the control areas within its region. …
- CHAPTER 2 Preliminary › 2.1. Glossary and Definitions… Renewable Energy Generating Station means a generating station based on a renewable source of energy with or without (REGS) Energy Storage System and shall include Renewable Hybrid Generating Station. …
3 matching passages in this document
Odisha Distribution (Conditions of Supply) Code, 2025 — Draft
Draft- 1. SHORT TITLE, COMMENCEMENT › 2. DEFINITIONS AND INTERPRETATIONS… indicating and recording electrical quantities like energy in kWh or KVAh, maximum demand in kW or KVA, reactive energy in KVAR hours etc. including accessories like Current Transformers (CT) and Potential Transformers (PT)/ Voltage …
- Restoration of supply of electricity › CHAPTER XIV FORCE MAJEURE AND RESTRICTION ON POWER SUPPLY… the licensee/supplier shall be under no obligation to supply energy contracted for. 214. (i) The consumer shall curtail or stagger or altogether stop using electricity when so directed by the engineer or the designated authority of …
3 matching passages in this document
Karnataka Electricity Distribution Code (KEDC), 2024 — Draft
Draft- 3.5 Energy Audit3.5 Energy Audit: The Distribution Licensee shall create responsibility centers for energy audit. Distribution sub-Division and Division in charge of Operation and Maintenance shall be made as responsibility centers and accountable for the …
- d) Geographical Information System (GIS)- Consumer Indexing … › 1. Geo coordinates controlled Asset record management… This will also facilitate conducting energy audit by estimating correctly the energy sales on the 11 kV Feeder / DTC and account for energy supplied to the 11 kV Feeder / DTC. 6. Commercial operations and O&M staff tagged to the assets …
3 matching passages in this document
Draft Karnataka Electricity Grid Code (KEGC) Regulations, 2024
Draft· finalised as Karnataka Electricity Grid Code (KEGC), 2025- 9. Primary Control… seconds for Intra state entity Generating Stations and energy storage systems. Higher resolution data from GT terminal shall be furnished by Generators to SLDC, which shall be verified by SLDC and same will be furnished to SRLDC. o. …
- 2.5.8 Role of Qualifying Co-ordinating Agency (QCA)… solar and hybrid generators including energy storage system connected to one or more pooling stations represented by it for the purpose of Grid Code in general and operational and scheduling liaison in particular. b. …
3 matching passages in this document
Gujarat Electricity Grid Code Regulations, 2013 — Draft
Draft· finalised as Gujarat Electricity Grid Code, 2013- V. Tariff Metering… Net Reactive Energy export/ import when voltage is below 97% (d) Cumulative active energy export/ import. (e) Average frequency for each 15 minute time block of the day (f) Provision of storage of data in non-volatile memory for at least …
- Check list to be ticked off › Regulatory Requirements of Special Energy Meters (Clause No …… Special energy meters of a uniform technical specification shall be provided on the electrical periphery of each state constituent, to determine its actual net interchange with the state grid. Each interconnection shall have one (1) main …
3 matching passages in this document