OERC · Odisha Electricity Regulatory Commission

Odisha Distribution (Conditions of Supply) Code, 2025 — Draft

Odisha Electricity Regulatory Commission Distribution (Conditions of Supply) Code, 2025

Draft codeDated 29 Jul 2025OERC/Engg.-92/2003(Vol.VIII)/965 dated 29.07.2025

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on orierc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is the Odisha Electricity Regulatory Commission's pre-published draft Distribution (Conditions of Supply) Code, 2025. A public notice dated 29.07.2025 states that the Commission has pre-published the draft under Section 181(3) of the Electricity Act, 2003, placed it on its website, and invited views/suggestions by 30.08.2025; the Commission may then modify and finalise it for publication in the official Gazette (p1). The draft notification says it is made under Section 50 read with Section 181 and Part VI of the Act and would govern supply by licensees/suppliers to consumers/end-users (p2).

Chapters I–II (pp2–11) give short title, commencement, territorial and personal applicability, and an extensive definition set. Clause 1.2 makes commencement conditional on Gazette publication; clause 1.6 says the Code supersedes the OERC Distribution (Conditions of Supply) Code, 2019 and its amendments, and clause 224 later repeals that 2019 Code with savings under the Orissa General Clauses Act, 1937 (pp2, 91).

Chapter III (pp12–36) is the core connection and supply chapter. It sets out application forms, document requirements, identity/ownership/address proofs, application fees, online portal and tracking, processing and inspection timelines, deemed acceptance/sanction, demand notes, load sanction, and estimates for service lines and network extension. It covers temporary supply, multiple connections, RWA single-point/individual connections, EV charging connections, shifting of connections/lines, transfer/change of name, change of classification, conversion of service, agreement and termination, security deposit (including load-factor table), interest and refund, service line ownership, and point of supply.

Chapters IV–V (pp36–57) deal with consumer installations and meters. They specify wiring and equipment standards by reference to CEA safety regulations, motor installation and starting-current limits, harmonic limits, testing and approval of LT/HT/EHT installations, commencement of supply, licensee access and safety, fuse failure, and additions/alterations. The meter chapter covers smart/prepaid meter types, ownership and consumer option to procure, CEA standards and accuracy classes, sealing, safety, reading, testing, replacement of defective/burnt/lost meters, and prosumer metering under the Commission's net/gross/VNM/GNM SOP.

Chapters VI–IX (pp57–68) cover contract demand and connected load (reduction/enhancement, billing demand), system of supply (frequency, voltage, power factor, load balancing, parallel operation), consumer classification (domestic, general purpose, public lighting, railway traction, irrigation, allied agricultural/agro-industrial, public water works, specified public purpose, industrial, heavy industry, mini steel, power-intensive, temporary supply, captive emergency supply), and charges (tariffs, minimum monthly fixed charges, demand charges, energy charges, statutory levies).

Chapter X (pp68–75) governs billing and recovery: bill contents, spot billing, pro-rata billing, disputed/erroneous bills, payment methods, advance payment, transformer loss, rebate, delayed payment surcharge, priority of adjustment, instalment facilities, public demand recovery, billing for defective/stuck/burnt/inaccessible meters, and disputed bills.

Chapters XI–XV (pp75–91) cover enforcement and administration. Chapter XI sets the framework for inspection, videography, reports, provisional and final assessment, appeals and interest in cases of theft and unauthorised use of electricity. Chapter XII covers temporary/permanent disconnection, prepaid smart meter disconnection, restoration of supply, and service of notice. Chapter XIII lists prohibitions (assignment, resale, unauthorised transfer, market dominance, open access). Chapter XIV provides force majeure and restriction-on-supply provisions. Chapter XV contains miscellaneous powers: orders/circulars, grievance redressal, standards of performance, removal of difficulties, power to relax/amend, saving of licensee/supplier business powers, application of CEA Regulations, repeal, interpretation and inherent powers.

Forms and appendices (pp92–105) provide application Form 1 (LT domestic/general purpose) and Form 2 (other categories), Form 3 standard agreement, Appendix-I for capital cost calculation, and Appendix-II for the disconnection notice.

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Metering

Read with this

Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on orierc.org ↗

Report an issue with this document