MERC · Maharashtra Electricity Regulatory Commission
Practice Directions under the Electricity Supply Code and Standards of Performance Regulations, 2021 — disclaimers on new-connection applications and electricity bills, 2023
PRACTICE DIRECTIONS UNDER MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (ELECTRICITY SUPPLY CODE AND STANDARDS OF PERFORMANCE OF DISTRIBUTION LICENSEES INCLUDING POWER QUALITY) REGULATIONS, 2021
OrderDated 26 Dec 2023
Made under the Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality Regulations, 2021.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Maharashtra Electricity Regulatory Commission issues a short practice direction requiring every distribution licensee in the State to carry a disclaimer on its application form for a new electricity connection and on its electricity bill, so that neither document can be read as proof that the premises is an authorised structure or as proof of ownership (p1–2).
The preamble sets out the trigger: the supply of power to unauthorised construction, and the practice of using an electricity bill to claim such construction is authorised, came before the Bombay High Court in Suo-Motu Writ Petition No. 2 of 2023. The Commission records the Court's reasoning that electricity supply is a service licensees are mandated to provide under the Electricity Act 2003 and has nothing to do with the legality or planning status of a structure; a distribution licensee is not a planning authority, nor even a local authority, under the Maharashtra Regional and Town Planning Act, 1966. The Court accepted the suggested disclaimer/caveat and ruled accordingly by order dated 30 November 2023 (p1–2).
Exercising its power under Regulation 29 of the Supply Code, 2021, the Commission then directs three things (p2): the exact disclaimer wording to be inserted in the new-connection application format; the exact statement to be inserted in the electricity bill; and that both be printed in Marathi and English, in addition to any other language the licensee chooses. It is a narrow, text-prescriptive direction — no formats are annexed, and no compliance date or consequence for non-compliance is stated.
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
- Dated 1 Mar 2021Practice Directions under Supply Code and Standards of Performance Regulations, 2021
- Dated 26 May 2021Revision of Contract Demand in a Billing Cycle — Practice Direction, 2021
- Dated 22 Jul 2024Practice Directions under the Electricity Supply Code and Standards of Performance Regulations, 2021 — 2024
Other copies of these documents (1)
5 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft, 1 copy in another language, 1 draft or notice on a draft not held as English text and 1 procedure or order made under it not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.