MERC · Maharashtra Electricity Regulatory Commission
Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality Regulations, 2021
Maharashtra Electricity Regulatory Commission (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) Regulations, 2021
Gazette copyDate not statedNo. MERC/Legal/2021/66
A Gazette copy of the Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality Regulations, 2021 or of one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Maharashtra Electricity Regulatory Commission's 2021 Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality Regulations, issued as No. MERC/Legal/2021/66 under a long list of enabling provisions of the Electricity Act, 2003 spanning supply on request, charges and deposits, recovery of dues and standards of performance (p83). Regulation 1 gives the short title and consolidates two earlier instruments: clause 1.2 repeals MERC's 2005 Electricity Supply Code and Other Conditions of Supply Regulations and its 2014 Standards of Performance of Distribution Licensees Regulations, while clause 1.3 saves anything done, any action taken and any proceedings initiated under them, deeming those to continue under this Code to the extent they were consistent with the Act (p83). Clause 1.4 makes the forms and formats annexed to the Code minimum requirements for distribution licensees, which may amend them — including adding provisions not inconsistent with the Act and the Regulations — only with the Commission's prior approval, after which the amended forms are posted on the licensee's website for consumers (p83).
Only two pages of the document are reproduced here: the opening page and PDF page 142, which carries only the heading to Regulation 28, 'General Provisions', with no text under it (p142). The substance of the Code — the supply-code obligations, the standards of performance and power quality standards, and the compensation and reporting machinery.
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
- Dated 1 Mar 2021Practice Directions under Supply Code and Standards of Performance Regulations, 2021
- Dated 26 May 2021Revision of Contract Demand in a Billing Cycle — Practice Direction, 2021
- Dated 26 Dec 2023Practice Directions under the Electricity Supply Code and Standards of Performance Regulations, 2021 — disclaimers on new-connection applications and electricity bills, 2023
- Dated 22 Jul 2024Practice Directions under the Electricity Supply Code and Standards of Performance Regulations, 2021 — 2024
5 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft, 1 copy in another language, 1 draft or notice on a draft not held as English text and 1 procedure or order made under it not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.